Ceiling panels in master bedroom are discoloured

    Details

    • Type: Wallboards/Ceiling Boards (8 Weeks) Wallboards/Ceiling Boards (8 Weeks)
    • Status: Complete
    • Priority: Critical Critical
    • Resolution: Completed
    • Labels:
      None
    • Customer Code:
      TANG01
    • Park:
      Tanglewood Caravan Park
    • Postcode:
      BH16 6JY
    • Responsibility:
      Manufacturer Attending
    • Plot:
      plot 30
    • Serial:
      1350460
    • Model:
      Ashcroft
    • Size:
      38x12 2 bed
    • ID Number:
      ARE57115
    • Status Colour:
      Complete Complete
    • Park_Company:
       Not defined
    • SLA Status:

      Description

      Ceiling panels in master bedroom are discoloured
      1. ABI-1000-1001.doc
        73 kB
        Ann Johnston
      2. ARE56726.pdf
        59 kB
        Ann Johnston
      1. 1350460 pic 1.JPG
        111 kB
      2. 1350460 pic 2.JPG
        249 kB
      3. 1350460 pic 3.JPG
        305 kB
      4. 1350460 pic 4.JPG
        74 kB
      5. 1350460 pic 5.JPG
        40 kB

        Activity

        Hide
        Ann Johnston (Inactive) added a comment -
        Submitted claim to ABI and sent acknowledgement letter to site.
        Show
        Ann Johnston (Inactive) added a comment - Submitted claim to ABI and sent acknowledgement letter to site.
        Hide
        Ann Johnston (Inactive) added a comment -
        ABI advise that their engineer is due to attend within the next 3 weeks.
        Show
        Ann Johnston (Inactive) added a comment - ABI advise that their engineer is due to attend within the next 3 weeks.
        Hide
        Ann Johnston (Inactive) added a comment -
        TP attended site on the 17/05/11 and reports that new ceiling panels are required. I will ask ABI for an update.
        Show
        Ann Johnston (Inactive) added a comment - TP attended site on the 17/05/11 and reports that new ceiling panels are required. I will ask ABI for an update.
        Hide
        Ann Johnston (Inactive) added a comment -
        ABI engineer attended site on the 17/05 and reports that new ceiling panels are required. I have emailed Diane asking if the parts have been ordered and the work re-scheduled.
        Show
        Ann Johnston (Inactive) added a comment - ABI engineer attended site on the 17/05 and reports that new ceiling panels are required. I have emailed Diane asking if the parts have been ordered and the work re-scheduled.
        Hide
        Ann Johnston (Inactive) added a comment -
        Diane has advised that their engineer is scheduled for week commencing 13/06/11
        Show
        Ann Johnston (Inactive) added a comment - Diane has advised that their engineer is scheduled for week commencing 13/06/11
        Hide
        Ann Johnston (Inactive) added a comment -
        Tina at the site says this issue is still outstanding, I will contact ABI and find out when their engineer will be attending.
        Show
        Ann Johnston (Inactive) added a comment - Tina at the site says this issue is still outstanding, I will contact ABI and find out when their engineer will be attending.
        Hide
        Claire Folland added a comment -
        Spoke to Tina at the park, she is happy ABI completed this last week
        Show
        Claire Folland added a comment - Spoke to Tina at the park, she is happy ABI completed this last week

          People

          • Watchers:
            0 Start watching this issue

            Dates

            • Due:
              Created:
              Updated:
              Resolved:
              Work Scheduled: