Atlas
  1. Atlas
  2. ATL-205

shower inlet panel not fixed at bottom- grommets missing

    Details

    • Type: Small Fittings (8 Weeks) Small Fittings (8 Weeks)
    • Status: Complete
    • Priority: Critical Critical
    • Resolution: Completed
    • Labels:
      None
    • Customer Code:
      DURD01
    • Park:
      Durdle Door
    • Postcode:
      BH20 5PU
    • Responsibility:
      Manufacturer Attending
    • Plot:
      2 E
    • Serial:
      AT008678/03
    • Model:
      Andromeda
    • Size:
      36x12
    • Status Colour:
      Complete Complete
    • Park_Company:
       Not defined
    • SLA Status:
    1. CCF11012012_00002.pdf
      782 kB
      Claire Folland
    1. durdle door fleet 009 (2).JPG
      1.36 MB
    2. screenshot-1.jpg
      154 kB

      Activity

      Claire Folland created issue -
      Claire Folland made changes -
      Field Original Value New Value
      Summary CLONE - lounge picture loose at bottom shower inlet panel not fixed at bottom- grommets missing
      Attachment durdle door fleet 009 (2).JPG [ 20958 ]
      Claire Folland made changes -
      Status Open [ 1 ] Submitted [ 10001 ]
      Lorraine Pryor (Inactive) made changes -
      Attachment screenshot-1.jpg [ 21369 ]
      Lorraine Pryor (Inactive) made changes -
      Status Submitted [ 10001 ] Acknowledged [ 10005 ]
      Hide
      Lorraine Pryor (Inactive) added a comment -
      <p>Michele from Atlas has e-mailed back to say she has received the warranty that claire e-mailed, i will change these to acknowledge now. and move them on</p>
      Show
      Lorraine Pryor (Inactive) added a comment - <p>Michele from Atlas has e-mailed back to say she has received the warranty that claire e-mailed, i will change these to acknowledge now. and move them on</p>
      Lorraine Pryor (Inactive) made changes -
      Status Acknowledged [ 10005 ] Parts ordered [ 3 ]
      Lorraine Pryor (Inactive) made changes -
      Status Parts ordered [ 3 ] Parts Recieved [ 10003 ]
      Lorraine Pryor (Inactive) made changes -
      Status Parts Recieved [ 10003 ] Worksheet Issued [ 10004 ]
      Lorraine Pryor (Inactive) made changes -
      Work Scheduled 14/Feb/12
      Status Worksheet Issued [ 10004 ] Engineer Scheduled [ 10000 ]
      Hide
      Lorraine Pryor (Inactive) added a comment -
      This is still showing on Atlas outstanding list, but it doesn't state when their engineer ill be attending I have sent and e-mail to Michele to ask?
      Show
      Lorraine Pryor (Inactive) added a comment - This is still showing on Atlas outstanding list, but it doesn't state when their engineer ill be attending I have sent and e-mail to Michele to ask?
      Adrienne Barwell (Inactive) made changes -
      Priority Normal [ 21 ] High [ 23 ]
      Adrienne Barwell (Inactive) made changes -
      Priority High [ 23 ] Critical [ 24 ]
      Hide
      Claire Folland added a comment -
      Michelle from Atlas has advised these have been posted out to park
      Show
      Claire Folland added a comment - Michelle from Atlas has advised these have been posted out to park
      Claire Folland made changes -
      Resolution Completed [ 1 ]
      Status Engineer Scheduled [ 10000 ] Resolved [ 5 ]
      Claire Folland made changes -
      Status Resolved [ 5 ] Complete [ 6 ]
      Mark Lock (Inactive) made changes -
      Workflow Surfbay [ 65135 ] Manufacturers ver 2.0 [ 85435 ]
      Adrienne Barwell (Inactive) made changes -
      Workflow Manufacturers ver 2.0 [ 85435 ] Manufacturers ver 2.1 [ 123756 ]
      Adrienne Barwell (Inactive) made changes -
      Workflow Manufacturers ver 2.1 [ 123756 ] Manufacturers ver 2.2 [ 140994 ]
      Transition Time In Source Status Execution Times Last Executer Last Execution Date
      Open Open Submitted Submitted
      1d 2h 38m 1 Claire Folland 12/Jan/12 1:25 PM
      Submitted Submitted Acknowledged Acknowledged
      12d 2m 1 Lorraine Pryor (Inactive) 24/Jan/12 1:28 PM
      Acknowledged Acknowledged Parts ordered Parts ordered
      3m 29s 1 Lorraine Pryor (Inactive) 24/Jan/12 1:32 PM
      Parts ordered Parts ordered Parts Recieved Parts Recieved
      5s 1 Lorraine Pryor (Inactive) 24/Jan/12 1:32 PM
      Parts Recieved Parts Recieved Worksheet Issued Worksheet Issued
      2s 1 Lorraine Pryor (Inactive) 24/Jan/12 1:32 PM
      Worksheet Issued Worksheet Issued Engineer Scheduled Engineer Scheduled
      7s 1 Lorraine Pryor (Inactive) 24/Jan/12 1:32 PM
      Engineer Scheduled Engineer Scheduled Resolved Resolved
      49d 21h 57m 1 Claire Folland 14/Mar/12 11:29 AM
      Resolved Resolved Complete Complete
      2s 1 Claire Folland 14/Mar/12 11:30 AM

        People

        • Watchers:
          0 Start watching this issue

          Dates

          • Due:
            Created:
            Updated:
            Resolved:
            Work Scheduled: