Details

    • Type: Wallboards/Ceiling Boards (8 Weeks) Wallboards/Ceiling Boards (8 Weeks)
    • Status: Complete
    • Priority: Critical Critical
    • Resolution: Completed
    • Labels:
      None
    • Customer Code:
      GORS01
    • Park:
      Gorselands CP
    • Postcode:
      DT2 9DJ
    • Responsibility:
      Undecided
    • Plot:
      75
    • Serial:
      AT008098/02
    • Model:
      CAPRICORN
    • Size:
      28X12X2
    • Status Colour:
      Complete Complete
    • Park_Company:
       Not defined
    • SLA Status:

      Description

      NOISE COMING FROM THE ROOF- COMING FROM OUTSIDE AT THE FRONT- TOP LEFT HAND SIDE.
      1. screenshot-1.jpg
        220 kB
      2. screenshot-2.jpg
        174 kB
      3. screenshot-3.jpg
        185 kB
      4. screenshot-4.jpg
        140 kB

        Activity

        Hide
        Claire Folland added a comment -
        chased atlas for an update
        Show
        Claire Folland added a comment - chased atlas for an update
        Hide
        Lorraine Pryor (Inactive) added a comment -
        MICHELE AT ATLAS HAS ADVISED ME THAT THIS WILL BE DONE 2ND/3RD WEEK OF DEC.
        Show
        Lorraine Pryor (Inactive) added a comment - MICHELE AT ATLAS HAS ADVISED ME THAT THIS WILL BE DONE 2ND/3RD WEEK OF DEC.
        Hide
        Adrienne Barwell (Inactive) added a comment -
        Brenda advised that an engineer had visited once, but this was a two man job so he went away again, I confirmed that the notes show that Atlas will be attending the second or third week in December.
        Show
        Adrienne Barwell (Inactive) added a comment - Brenda advised that an engineer had visited once, but this was a two man job so he went away again, I confirmed that the notes show that Atlas will be attending the second or third week in December.
        Hide
        Lorraine Pryor (Inactive) added a comment -
        Atlas was due to go before xmas, this wasn't done.
        So I will change the engineer date to after xmas
        Show
        Lorraine Pryor (Inactive) added a comment - Atlas was due to go before xmas, this wasn't done. So I will change the engineer date to after xmas
        Hide
        Lorraine Pryor (Inactive) added a comment -
        as of 10th jan on Atlas outstanding report- this shows that they did first visit site 19th oct with one man, then went back with 2 men but it was two windy to go on the roof. Will now go back w/c 06th feb12.
        Will e-mail the site to tell them.
        Show
        Lorraine Pryor (Inactive) added a comment - as of 10th jan on Atlas outstanding report- this shows that they did first visit site 19th oct with one man, then went back with 2 men but it was two windy to go on the roof. Will now go back w/c 06th feb12. Will e-mail the site to tell them.
        Hide
        Lorraine Pryor (Inactive) added a comment -
        This is still showing on Atlas outstanding list, but it doesn't state when their engineer ill be attending I have sent and e-mail to Michele to ask?
        Show
        Lorraine Pryor (Inactive) added a comment - This is still showing on Atlas outstanding list, but it doesn't state when their engineer ill be attending I have sent and e-mail to Michele to ask?
        Hide
        Adrienne Barwell (Inactive) added a comment -
        Atlas advise this is complete
        Show
        Adrienne Barwell (Inactive) added a comment - Atlas advise this is complete