Good Will
  1. Good Will
  2. GW-363

The drawer runner in the main bedroom has been damaged (top drawer under the wardrobe)

    Details

    • Type: Bedroom Furniture (8 Weeks) Bedroom Furniture (8 Weeks)
    • Status: Awaiting Quote
    • Priority: Over 6 Weeks Over 6 Weeks
    • Resolution: Unresolved
    • Labels:
      None
    • Park_Company:
       Beverley Holidays Parks Goodrington
    • Park_Code:
      BEVE01
    • Park_Postcode:
      TQ4 7JE
    • Park_Email:
      Linda: admin@beverley-holidays.co.uk, sales@beverley-holidays.co.uk (main email)
    • Park_Phone:
      01803 843887
    • Plot:
      372
    • Model:
      Atlas SAPPHIRE
    • Stock_Number:
      28401
    • Serial:
      AT009308/04
    • Size:
      35 x 12 x 2
    • Status Colour:
      Awaiting Quote Awaiting Quote
    • Additional Contact Details:
      Hide
      Tim 01803 843887
      Beverley Parks (Goodrington) Ltd
      Goodrington Road
      Paignton
      Devon
      TQ4 7JE
      Show
      Tim 01803 843887 Beverley Parks (Goodrington) Ltd Goodrington Road Paignton Devon TQ4 7JE
    • Park:
      BEVERLEY PARKS
    • Postcode:
      TQ4 7JE
    1. SKM_C224e14102909470.pdf
      277 kB
      Ellie W
    1. 03.09.14 email to Katrina.jpg
      152 kB
    2. 03.09.14 email to park.jpg
      133 kB
    3. 03.11.14 gw-363 drawer wrong one.jpg
      889 kB
    4. 06.10.14 email to Atlas.jpg
      147 kB
    5. 12.8.14.jpg
      151 kB
    6. 17.09.14 update to park.jpg
      138 kB
    7. screenshot-1.jpg
      140 kB
    8. screenshot-2.jpg
      156 kB
    9. Submitted into Atlas.jpg
      138 kB

      Issue Links

        Activity

        Adrienne Barwell (Inactive) created issue -
        Adrienne Barwell (Inactive) made changes -
        Field Original Value New Value
        Project Atlas [ 10040 ] Good Will [ 10454 ]
        Key ATL-1707 GW-363
        Workflow Manufacturers ver 2.0 [ 111540 ] Pre-Owned Ver 2.0 [ 111541 ]
        Status Open [ 1 ] Awaiting Quote [ 10006 ]
        Category SurfBay Attending [ 10042 ]
        Customer Code BEVE01
        Hire_or_Retail Retail [ 10251 ]
        Adrienne Barwell (Inactive) made changes -
        Assignee CCare Temp [ temp ] Lorraine Pryor [ lorraine ]
        Hide
        Adrienne Barwell (Inactive) added a comment -
        Lorraine to order part
        Show
        Adrienne Barwell (Inactive) added a comment - Lorraine to order part
        Adrienne Barwell (Inactive) made changes -
        Link This issue Same Van ATL-1677 [ ATL-1677 ]
        Hide
        Lorraine Pryor (Inactive) added a comment -
        I have e-mailed the park to ask which drawer runner is damaged as I would need to know so that I can place the item on order
        Show
        Lorraine Pryor (Inactive) added a comment - I have e-mailed the park to ask which drawer runner is damaged as I would need to know so that I can place the item on order
        Hide
        Lorraine Pryor (Inactive) added a comment -
        I have e-mailed the park asking if they can tell me which sink plug and drawer runner is damaged.
        Once I know I can then put all the parts for this van on order
        Show
        Lorraine Pryor (Inactive) added a comment - I have e-mailed the park asking if they can tell me which sink plug and drawer runner is damaged. Once I know I can then put all the parts for this van on order
        Hide
        Lorraine Pryor (Inactive) added a comment -
        I have sent an e-mail over to Katrina to get the cost of the parts as they park have today advise me that it the
         plug in the kitchen sink and the runner on the top drawer under the wardrobe.
        no waiting for a reply.
        I have also e-mailed Adam at the park back to say that we will get the parts on order and when they come in send an engineer out
        Show
        Lorraine Pryor (Inactive) added a comment - I have sent an e-mail over to Katrina to get the cost of the parts as they park have today advise me that it the  plug in the kitchen sink and the runner on the top drawer under the wardrobe. no waiting for a reply. I have also e-mailed Adam at the park back to say that we will get the parts on order and when they come in send an engineer out
        Lorraine Pryor (Inactive) made changes -
        Summary The drawer runner in the main bedroom has been damaged The drawer runner in the main bedroom has been damaged (top drawer under the wardrobe)
        Lorraine Pryor (Inactive) made changes -
        Attachment 03.09.14 email to Katrina.jpg [ 71404 ]
        Lorraine Pryor (Inactive) made changes -
        Attachment 03.09.14 email to park.jpg [ 71411 ]
        Hide
        Lorraine Pryor (Inactive) added a comment -
        I have still not received a reply from Katrina as to the cost of these parts, I have today chased her saying that I need to order these parts ASAP and can she advise me of a delivery date for them.
        I have given her P/O no AS8878/5041.
        Now waiting for a reply from Katrina
        Show
        Lorraine Pryor (Inactive) added a comment - I have still not received a reply from Katrina as to the cost of these parts, I have today chased her saying that I need to order these parts ASAP and can she advise me of a delivery date for them. I have given her P/O no AS8878/5041. Now waiting for a reply from Katrina
        Lorraine Pryor (Inactive) made changes -
        Attachment screenshot-1.jpg [ 71898 ]
        Hide
        Lorraine Pryor (Inactive) added a comment -
        Park have e-mail to ask if the parts have come in yet. I have e-mailed Adam back to say that Atlas have to order the parts in and Im unable to give him a delivery day, as soon as I get any updates from Atlas I will let him know.
        I have chased Katrina up by email today saying that Im still waiting for the prices from her, I have told her that we need these parts ASAP as they was rejected under warranty and we need to get the work done ASAP..
        Show
        Lorraine Pryor (Inactive) added a comment - Park have e-mail to ask if the parts have come in yet. I have e-mailed Adam back to say that Atlas have to order the parts in and Im unable to give him a delivery day, as soon as I get any updates from Atlas I will let him know. I have chased Katrina up by email today saying that Im still waiting for the prices from her, I have told her that we need these parts ASAP as they was rejected under warranty and we need to get the work done ASAP..
        Lorraine Pryor (Inactive) made changes -
        Attachment screenshot-2.jpg [ 72399 ]
        Hide
        Lorraine Pryor (Inactive) added a comment -
        Katrina from Atlas has replied to say "Looking at the order system the ETA is 30/09/14 at the moment. However if they come in earlier we will get them out to you."
        I will update the park
        Show
        Lorraine Pryor (Inactive) added a comment - Katrina from Atlas has replied to say "Looking at the order system the ETA is 30/09/14 at the moment. However if they come in earlier we will get them out to you." I will update the park
        Lorraine Pryor (Inactive) made changes -
        Parts Expected 30/Oct/14
        Lorraine Pryor (Inactive) made changes -
        Status Awaiting Quote [ 10006 ] Quotation supplied [ 10007 ]
        Manufacturer Atlas
        Lorraine Pryor (Inactive) made changes -
        Status Quotation supplied [ 10007 ] Quotation accepted [ 10008 ]
        Lorraine Pryor (Inactive) made changes -
        Status Quotation accepted [ 10008 ] Parts ordered [ 3 ]
        Lorraine Pryor (Inactive) made changes -
        Attachment 17.09.14 update to park.jpg [ 72586 ]
        Hide
        Lorraine Pryor (Inactive) added a comment -
        Adam at the park was chasing this up saying the the owner wants to know that Atlas will be doing the outstanding work.
        I have e-mailed him back to say "Sorry your e-mails seem to be going into our Spam.
        The following was rejected by Atlas, but we have ordered the parts as Good will.
        1) The drawer runner in the main bedroom has been damaged (top drawer under the wardrobe)
        2) Scratches to the cooker door
        3) Kitchen Plug for the sink is missing
        4) The net opposite the fire, above the settee, is too short
        We are waiting for the parts to come in from Atlas, at the moment they have a provisional due date of 30.09.14.
        Show
        Lorraine Pryor (Inactive) added a comment - Adam at the park was chasing this up saying the the owner wants to know that Atlas will be doing the outstanding work. I have e-mailed him back to say "Sorry your e-mails seem to be going into our Spam. The following was rejected by Atlas, but we have ordered the parts as Good will. 1) The drawer runner in the main bedroom has been damaged (top drawer under the wardrobe) 2) Scratches to the cooker door 3) Kitchen Plug for the sink is missing 4) The net opposite the fire, above the settee, is too short We are waiting for the parts to come in from Atlas, at the moment they have a provisional due date of 30.09.14.
        Hide
        Lorraine Pryor (Inactive) added a comment -
        Tim from the park called to chase these parts up, the last update was that the parts was due in provisional date of the 30.09.14.
        We have just has a delivery from Atlas and they are not on it.
        I have e-mailed Katrina at Atlas to ask for an update.
        Show
        Lorraine Pryor (Inactive) added a comment - Tim from the park called to chase these parts up, the last update was that the parts was due in provisional date of the 30.09.14. We have just has a delivery from Atlas and they are not on it. I have e-mailed Katrina at Atlas to ask for an update.
        Hide
        Lorraine Pryor (Inactive) added a comment -
        I have still not had a update re delivery date yet from Katrina at Atlas, I have sent her an e-mail asking for an update.
        Show
        Lorraine Pryor (Inactive) added a comment - I have still not had a update re delivery date yet from Katrina at Atlas, I have sent her an e-mail asking for an update.
        Lorraine Pryor (Inactive) made changes -
        Attachment 06.10.14 email to Atlas.jpg [ 74519 ]
        Hide
        Lorraine Pryor (Inactive) added a comment -
        I have emailed Vanessa re this parts, Katrina has just called so I have asked her when we might get these's part in?
        She said that she is still unable to give me a date as she has t speak to Niven and then arrange for ECS to collect them.. I have said that I really need a date asap as the park are not happy.. I will just have to keep chasing atlas/ vanessa
        Show
        Lorraine Pryor (Inactive) added a comment - I have emailed Vanessa re this parts, Katrina has just called so I have asked her when we might get these's part in? She said that she is still unable to give me a date as she has t speak to Niven and then arrange for ECS to collect them.. I have said that I really need a date asap as the park are not happy.. I will just have to keep chasing atlas/ vanessa
        Adrienne Barwell (Inactive) made changes -
        Workflow Pre-Owned Ver 2.0 [ 111541 ] Pre-Owned Ver 2.5 [ 113292 ]
        Adrienne Barwell (Inactive) made changes -
        Park_Company Beverley Parks Goodrington (59)
        Adrienne Barwell (Inactive) made changes -
        Park_Postcode TQ4 7JE
        Park_Phone 1803843887
        Park_Code BEVE01
        Park_City Paignton
        Park_Address Goodrington Road
        Adrienne Barwell (Inactive) made changes -
        Priority Normal [ 21 ] Over 6 Weeks [ 27 ]
        Hide
        Lorraine Pryor (Inactive) added a comment -
        Katrina has still not advise me when these parts are due into me. I have emailed her again asking for a date.
        Show
        Lorraine Pryor (Inactive) added a comment - Katrina has still not advise me when these parts are due into me. I have emailed her again asking for a date.
        Hide
        Lorraine Pryor (Inactive) added a comment -
        Katrina has called me to say that ECS have collected the parts last thursday, so we should get these in this week, when they arrive we need to issue a worksheet to get our engineer out to resolve these issue.
        Can we also let the park know that the parts are in so they are updated.
        Show
        Lorraine Pryor (Inactive) added a comment - Katrina has called me to say that ECS have collected the parts last thursday, so we should get these in this week, when they arrive we need to issue a worksheet to get our engineer out to resolve these issue. Can we also let the park know that the parts are in so they are updated.
        Hide
        Claire Folland added a comment -
        received replacement oven door, issued worksheet
        Show
        Claire Folland added a comment - received replacement oven door, issued worksheet
        Claire Folland made changes -
        Status Parts ordered [ 3 ] Parts Recieved [ 10003 ]
        Plot
        Parts in 31/May/11 4:29 PM 16/Oct/14 4:29 PM
        Claire Folland made changes -
        Status Parts Recieved [ 10003 ] Worksheet Issued [ 10004 ]
        Hide
        Maureen Hooper (Inactive) added a comment -
        Tim phoned to find out how things are standing at the present time, I told him I would check the worksheets when we get them back from the engineer and give him a call back early next week
        Show
        Maureen Hooper (Inactive) added a comment - Tim phoned to find out how things are standing at the present time, I told him I would check the worksheets when we get them back from the engineer and give him a call back early next week
        Hide
        Lorraine Pryor (Inactive) added a comment -
        Tim called to chase these issue up and see if parts are in.
        I have advise him that the parts are in and we are waiting to send our engineer out to fit the parts.
        Spoken to ade and she has written this on her board for us to attend next week, I have advise Tim that it will be next week but I can tell him the day until friday when the scheduling is done.
        I have put a note on the work sheet to say we need to call tim to say which day we are going .
        Show
        Lorraine Pryor (Inactive) added a comment - Tim called to chase these issue up and see if parts are in. I have advise him that the parts are in and we are waiting to send our engineer out to fit the parts. Spoken to ade and she has written this on her board for us to attend next week, I have advise Tim that it will be next week but I can tell him the day until friday when the scheduling is done. I have put a note on the work sheet to say we need to call tim to say which day we are going .
        Hide
        Ellie W (Inactive) added a comment -
        Keith has been to see this and has said that the drawer runner doesn't fit - Lorraine has spoken to Keith to ask about this.
        Show
        Ellie W (Inactive) added a comment - Keith has been to see this and has said that the drawer runner doesn't fit - Lorraine has spoken to Keith to ask about this.
        Ellie W (Inactive) made changes -
        Attachment SKM_C224e14102909470.pdf [ 76246 ]
        Lorraine Pryor (Inactive) made changes -
        Hide
        Lorraine Pryor (Inactive) added a comment -
        I how have a photo of the runner/ drawer, I will send this over the Katrina to see if she can get this out to us ASAP
        Show
        Lorraine Pryor (Inactive) added a comment - I how have a photo of the runner/ drawer, I will send this over the Katrina to see if she can get this out to us ASAP
        Lorraine Pryor (Inactive) made changes -
        Times Scheduled 1
        Status Worksheet Issued [ 10004 ] Engineer Scheduled [ 10000 ]
        Lorraine Pryor (Inactive) made changes -
        Status Engineer Scheduled [ 10000 ] Resolved [ 5 ]
        Resolution Completed [ 1 ]
        Lorraine Pryor (Inactive) made changes -
        Status Resolved [ 5 ] Complete [ 6 ]
        Lorraine Pryor (Inactive) made changes -
        Status Complete [ 6 ] Complete [ 6 ]
        made changes -
        Park_Address2
        made changes -
        Park_Contact
        made changes -
        Park_Key_Account false
        made changes -
        Park_Key_Account false
        made changes -
        Park_Contact
        made changes -
        Park_Address2
        made changes -
        Park_Contact
        made changes -
        Park_Address2
        made changes -
        Park_Key_Account false 1
        made changes -
        Park_Contact
        made changes -
        Park_Key_Account No
        made changes -
        Park_Address2
        made changes -
        Park_Contact
        made changes -
        Park_Key_Account no No
        Hide
        Ellie W (Inactive) added a comment -
        Received invoice from atlas - completed order on sage
        charged to stock number
        Show
        Ellie W (Inactive) added a comment - Received invoice from atlas - completed order on sage charged to stock number
        made changes -
        Status Complete [ 6 ] Complete [ 6 ]
        made changes -
        Resolution Completed [ 1 ]
        Status Complete [ 6 ] Reopened [ 4 ]
        made changes -
        Status Reopened [ 4 ] Awaiting Quote [ 10006 ]
        Transition Time In Source Status Execution Times Last Executer Last Execution Date
        Open Open Awaiting Quote Awaiting Quote
        31s 1 Adrienne Barwell (Inactive) 22/Aug/14 3:29 PM
        Awaiting Quote Awaiting Quote Quotation supplied Quotation supplied
        25d 20h 30m 1 Lorraine Pryor (Inactive) 17/Sep/14 12:00 PM
        Quotation supplied Quotation supplied Quotation accepted Quotation accepted
        2s 1 Lorraine Pryor (Inactive) 17/Sep/14 12:00 PM
        Quotation accepted Quotation accepted Parts ordered Parts ordered
        3s 1 Lorraine Pryor (Inactive) 17/Sep/14 12:00 PM
        Parts ordered Parts ordered Parts Recieved Parts Recieved
        29d 2h 12m 1 Claire Folland 16/Oct/14 2:13 PM
        Parts Recieved Parts Recieved Worksheet Issued Worksheet Issued
        6s 1 Claire Folland 16/Oct/14 2:13 PM
        Worksheet Issued Worksheet Issued Engineer Scheduled Engineer Scheduled
        17d 20h 44m 1 Lorraine Pryor (Inactive) 03/Nov/14 9:58 AM
        Engineer Scheduled Engineer Scheduled Resolved Resolved
        4s 1 Lorraine Pryor (Inactive) 03/Nov/14 9:58 AM
        Resolved Resolved Complete Complete
        2s 1 Lorraine Pryor (Inactive) 03/Nov/14 9:58 AM
        Complete Complete Complete Complete
        4148d 7h 45m 2 13/Mar/26 5:44 PM
        Complete Complete Reopened Reopened
        1s 1 13/Mar/26 5:44 PM
        Reopened Reopened Awaiting Quote Awaiting Quote
        6s 1 13/Mar/26 5:44 PM

          People

          • Watchers:
            2 Start watching this issue

            Dates

            • Due:
              Created:
              Updated:
              Parts in:
              Parts Expected: