PDI
  1. PDI
  2. PDI-68

pdi unit - This going to be late so when submit this please tell Atlas its late

    Details

    • Type: PDI (2 weeks) PDI (2 weeks)
    • Status: Done
    • Priority: Over 8 Weeks Over 8 Weeks
    • Resolution: Completed
    • Labels:
      None
    • Plot:
      unknown
    • Serial:
      AT011303/06
    • Model:
      Lilac
    • Status Colour:
      Done Done
    • Stock_Number:
      30308
    • Park_Company:
       Old Coastguard Caravan Park
    • Park_Postcode:
      DT6 4RL
    • Park_Phone:
      01308 897223
    • Park_Email:
      oldcoastguard@hotmail.com
    • Park_Code:
      OLDC01
    • Park_Key_Account:
      Yes
    1. SKM_C224e15010910190.pdf
      1.44 MB
      Adrienne Barwell
    1. screenshot-1.jpg
      188 kB
    2. screenshot-2.jpg
      149 kB

      Activity

      Hide
      Ellie W (Inactive) added a comment -
      PDI could not be carried out as it was in two halves (Lilac Lodge) and had not been unpacked - I have re-issued worksheet with note for park to be called to check that the van is ready
      Show
      Ellie W (Inactive) added a comment - PDI could not be carried out as it was in two halves (Lilac Lodge) and had not been unpacked - I have re-issued worksheet with note for park to be called to check that the van is ready
      Hide
      Adrienne Barwell (Inactive) added a comment -
      I have informed Vanessa that this is going to have a late pdi, she has advised that we will need to remind her when we put the claim through and also if anything gets rejected.
      Show
      Adrienne Barwell (Inactive) added a comment - I have informed Vanessa that this is going to have a late pdi, she has advised that we will need to remind her when we put the claim through and also if anything gets rejected.
      Hide
      Claire Folland added a comment -
      Linda has emailed to advise this has now been sited, we can go ahead with the pdi
      Show
      Claire Folland added a comment - Linda has emailed to advise this has now been sited, we can go ahead with the pdi
      Hide
      Adrienne Barwell (Inactive) added a comment -
      Linda has confirmed that this unit has now been sited an is ready for the pdi, we will arrange this for next week
      Show
      Adrienne Barwell (Inactive) added a comment - Linda has confirmed that this unit has now been sited an is ready for the pdi, we will arrange this for next week
      Hide
      Adrienne Barwell (Inactive) added a comment -
      pdi carried out by Keith
      Show
      Adrienne Barwell (Inactive) added a comment - pdi carried out by Keith
      Hide
      Adrienne Barwell (Inactive) added a comment -
      paperwork passed to the customer care team
      Show
      Adrienne Barwell (Inactive) added a comment - paperwork passed to the customer care team

        People

        • Watchers:
          0 Start watching this issue

          Dates

          • Due:
            Created:
            Updated:
            Resolved:
            Work Scheduled: