Details

    • Type: Wallboards/Ceiling Boards (8 Weeks) Wallboards/Ceiling Boards (8 Weeks)
    • Status: Complete
    • Priority: Over 6 Weeks Over 6 Weeks
    • Resolution: Completed
    • Labels:
      None
    • Plot:
      2
    • Model:
      Swift Burgundy 2014
    • Serial:
      TBA
    • Status Colour:
      Complete Complete
    • Supplier:
      Swift
    • Park_Company:
       Porthilly caravan park
    • Park_Code:
      PORT01
    • Park_Phone:
      01208 862862 / 07890034489 (Tim's mobile)
    • Park_Postcode:
      PL27 6JX
    • Park_Key_Account:
      No
    • SLA Status:

      Description

      Mr Ford called to get an idea of cost as he has a credit card size hole in the hallway.
      Plot no 2

        Activity

        Lorraine Pryor (Inactive) created issue -
        Lorraine Pryor (Inactive) made changes -
        Field Original Value New Value
        Issue Type Gutters/Downpipes/Corner Cappings (8 Weeks) [ 25 ] Wallboards/Ceiling Boards (8 Weeks) [ 6 ]
        Description customer would like van assessed for a quote, she is planning to keep the van for another 2 years

        Helena Stone 01202 550431
        Mr Ford called to get an idea of cost as he has a credit card size hole in the hallway.
        Due Date 05/Dec/14 24/Dec/14
        Serial TBA
        Supplier Swift [ 10353 ]
        Model carnaby Swift Burgundy 2014
        Lorraine Pryor (Inactive) made changes -
        Status Open [ 1 ] Worksheet Issued [ 10004 ]
        Lorraine Pryor (Inactive) made changes -
        Status Worksheet Issued [ 10004 ] Engineer Assessment Scheduled [ 10048 ]
        Work Scheduled 29/Oct/14
        Plot
        Hide
        Lorraine Pryor (Inactive) added a comment -
        Called Keithe to get an idea of how long this might take to give Mr Ford an idea as to the cost, keith was going down to the sites so he will pop into the site and have a look at the damaged as it will depend how big the hole is and where it is etc.
        Show
        Lorraine Pryor (Inactive) added a comment - Called Keithe to get an idea of how long this might take to give Mr Ford an idea as to the cost, keith was going down to the sites so he will pop into the site and have a look at the damaged as it will depend how big the hole is and where it is etc.
        Lorraine Pryor (Inactive) made changes -
        Description Mr Ford called to get an idea of cost as he has a credit card size hole in the hallway.
        Mr Ford called to get an idea of cost as he has a credit card size hole in the hallway.
        Plot no 2
        Lorraine Pryor (Inactive) made changes -
        Plot 2
        Hide
        Lorraine Pryor (Inactive) added a comment - - edited
        I said that if it the wallboard the aprox cost is £50.00 plus vat for a wallboard, travel to the site is £71.50, and labour is £37.50 1 hour min.
        I said wall paper is aprox £8-9 per meter/
        Once Keith looks at it will can then do a quote and email it it to him at:
        lance.ford@btinternet.com
        Show
        Lorraine Pryor (Inactive) added a comment - - edited I said that if it the wallboard the aprox cost is £50.00 plus vat for a wallboard, travel to the site is £71.50, and labour is £37.50 1 hour min. I said wall paper is aprox £8-9 per meter/ Once Keith looks at it will can then do a quote and email it it to him at: lance.ford@btinternet.com
        Hide
        Lorraine Pryor (Inactive) added a comment -
        park not paced an order for this part yet
        Show
        Lorraine Pryor (Inactive) added a comment - park not paced an order for this part yet
        Adrienne Barwell (Inactive) made changes -
        Workflow Quotes ver 2 [ 116666 ] Quotes ver 2.1 [ 152948 ]
        Hide
        Lorraine Pryor (Inactive) added a comment -
        Still not heard back from the park as yet
        Show
        Lorraine Pryor (Inactive) added a comment - Still not heard back from the park as yet
        Adrienne Barwell (Inactive) made changes -
        Priority Normal [ 21 ] Over 6 Weeks [ 27 ]
        Hide
        Lorraine Pryor (Inactive) added a comment -
        IIts been over 6 weeks now and the park have't been in touch so I will close this down nown
        Show
        Lorraine Pryor (Inactive) added a comment - IIts been over 6 weeks now and the park have't been in touch so I will close this down nown
        Lorraine Pryor (Inactive) made changes -
        Status Engineer Assessment Scheduled [ 10048 ] Awaiting Quote [ 10006 ]
        Lorraine Pryor (Inactive) made changes -
        Status Awaiting Quote [ 10006 ] Quotation supplied [ 10007 ]
        Lorraine Pryor (Inactive) made changes -
        Status Quotation supplied [ 10007 ] Quotation accepted [ 10008 ]
        Lorraine Pryor (Inactive) made changes -
        Status Quotation accepted [ 10008 ] Rejected [ 10002 ]
        Lorraine Pryor (Inactive) made changes -
        Status Rejected [ 10002 ] Resolved [ 5 ]
        Resolution Completed [ 1 ]
        Adrienne Barwell (Inactive) made changes -
        Workflow Quotes ver 2.1 [ 152948 ] Quotes ver 2.5 [ 155976 ]
        made changes -
        Park_Contact
        made changes -
        Park_Email
        made changes -
        Park_Key_Account No
        made changes -
        Park_Key_Account No
        Adrienne Barwell (Inactive) made changes -
        Workflow Quotes ver 2.5 [ 155976 ] Quotes ver 3 [ 170901 ]
        Adrienne Barwell (Inactive) made changes -
        Workflow Quotes ver 3 [ 170901 ] Quotes ver 3.1 [ 172636 ]
        made changes -
        Park_Contact
        Rose Crisp (Inactive) made changes -
        Status Resolved [ 5 ] Complete [ 6 ]
        Transition Time In Source Status Execution Times Last Executer Last Execution Date
        Open Open Worksheet Issued Worksheet Issued
        2m 48s 1 Lorraine Pryor (Inactive) 29/Oct/14 12:57 PM
        Worksheet Issued Worksheet Issued Engineer Assessment Scheduled Engineer Assessment Scheduled
        5s 1 Lorraine Pryor (Inactive) 29/Oct/14 12:57 PM
        Engineer Assessment Scheduled Engineer Assessment Scheduled Awaiting Quote Awaiting Quote
        76d 21h 46m 1 Lorraine Pryor (Inactive) 14/Jan/15 10:44 AM
        Awaiting Quote Awaiting Quote Quotation supplied Quotation supplied
        2s 1 Lorraine Pryor (Inactive) 14/Jan/15 10:44 AM
        Quotation supplied Quotation supplied Quotation accepted Quotation accepted
        2s 1 Lorraine Pryor (Inactive) 14/Jan/15 10:44 AM
        Quotation accepted Quotation accepted Rejected Rejected
        2s 1 Lorraine Pryor (Inactive) 14/Jan/15 10:44 AM
        Rejected Rejected Resolved Resolved
        2s 1 Lorraine Pryor (Inactive) 14/Jan/15 10:44 AM
        Resolved Resolved Complete Complete
        909d 21h 55m 1 Rose Crisp (Inactive) 12/Jul/17 9:39 AM

          People

          • Assignee:
            Lorraine Pryor (Inactive)
            Reporter:
            Lorraine Pryor (Inactive)
          • Watchers:
            0 Start watching this issue

            Dates

            • Due:
              Created:
              Updated:
              Resolved:
              Work Scheduled: