Details

    • Type: Wallboards/Ceiling Boards (8 Weeks) Wallboards/Ceiling Boards (8 Weeks)
    • Status: Complete
    • Priority: Over 6 Weeks Over 6 Weeks
    • Resolution: Completed
    • Labels:
      None
    • Plot:
      2
    • Model:
      Swift Burgundy 2014
    • Serial:
      TBA
    • Status Colour:
      Complete Complete
    • Supplier:
      Swift
    • Park_Company:
       Porthilly caravan park
    • Park_Code:
      PORT01
    • Park_Phone:
      01208 862862 / 07890034489 (Tim's mobile)
    • Park_Postcode:
      PL27 6JX
    • Park_Key_Account:
      No
    • SLA Status:

      Description

      Mr Ford called to get an idea of cost as he has a credit card size hole in the hallway.
      Plot no 2

        Activity

        Lorraine Pryor (Inactive) created issue -
        Lorraine Pryor (Inactive) made changes -
        Field Original Value New Value
        Issue Type Gutters/Downpipes/Corner Cappings (8 Weeks) [ 25 ] Wallboards/Ceiling Boards (8 Weeks) [ 6 ]
        Description customer would like van assessed for a quote, she is planning to keep the van for another 2 years

        Helena Stone 01202 550431
        Mr Ford called to get an idea of cost as he has a credit card size hole in the hallway.
        Due Date 05/Dec/14 24/Dec/14
        Serial TBA
        Supplier Swift [ 10353 ]
        Model carnaby Swift Burgundy 2014
        Lorraine Pryor (Inactive) made changes -
        Status Open [ 1 ] Worksheet Issued [ 10004 ]
        Lorraine Pryor (Inactive) made changes -
        Status Worksheet Issued [ 10004 ] Engineer Assessment Scheduled [ 10048 ]
        Work Scheduled 29/Oct/14
        Plot
        Lorraine Pryor (Inactive) made changes -
        Description Mr Ford called to get an idea of cost as he has a credit card size hole in the hallway.
        Mr Ford called to get an idea of cost as he has a credit card size hole in the hallway.
        Plot no 2
        Lorraine Pryor (Inactive) made changes -
        Plot 2
        Adrienne Barwell (Inactive) made changes -
        Workflow Quotes ver 2 [ 116666 ] Quotes ver 2.1 [ 152948 ]
        Adrienne Barwell (Inactive) made changes -
        Priority Normal [ 21 ] Over 6 Weeks [ 27 ]
        Lorraine Pryor (Inactive) made changes -
        Status Engineer Assessment Scheduled [ 10048 ] Awaiting Quote [ 10006 ]
        Lorraine Pryor (Inactive) made changes -
        Status Awaiting Quote [ 10006 ] Quotation supplied [ 10007 ]
        Lorraine Pryor (Inactive) made changes -
        Status Quotation supplied [ 10007 ] Quotation accepted [ 10008 ]
        Lorraine Pryor (Inactive) made changes -
        Status Quotation accepted [ 10008 ] Rejected [ 10002 ]
        Lorraine Pryor (Inactive) made changes -
        Status Rejected [ 10002 ] Resolved [ 5 ]
        Resolution Completed [ 1 ]
        Adrienne Barwell (Inactive) made changes -
        Workflow Quotes ver 2.1 [ 152948 ] Quotes ver 2.5 [ 155976 ]
        made changes -
        Park_Contact
        made changes -
        Park_Email
        made changes -
        Park_Key_Account No
        made changes -
        Park_Key_Account No
        Adrienne Barwell (Inactive) made changes -
        Workflow Quotes ver 2.5 [ 155976 ] Quotes ver 3 [ 170901 ]
        Adrienne Barwell (Inactive) made changes -
        Workflow Quotes ver 3 [ 170901 ] Quotes ver 3.1 [ 172636 ]
        made changes -
        Park_Contact
        Rose Crisp (Inactive) made changes -
        Status Resolved [ 5 ] Complete [ 6 ]

          People

          • Assignee:
            Lorraine Pryor (Inactive)
            Reporter:
            Lorraine Pryor (Inactive)
          • Watchers:
            0 Start watching this issue

            Dates

            • Due:
              Created:
              Updated:
              Resolved:
              Work Scheduled: