Details

    • Type: White Goods White Goods
    • Status: Awaiting Quote
    • Priority: Normal Normal
    • Resolution: Unresolved
    • Labels:
      None
    • Park_Company:
       Surf Bay Leisure (Winkleigh)
    • Park_Code:
      SURF99
    • Park_Postcode:
      EX19 8DW
    • Park_Email:
      warranty@surfbay.co.uk
    • Park_Phone:
      01837 680100
    • Plot:
      Showground
    • Model:
      Ardennes
    • Stock_Number:
      41982
    • Serial:
      046205H
    • Size:
      36x12 2 Bed
    • Status Colour:
      Awaiting Quote Awaiting Quote

      Description

      Hi Duncan

      Could you please take a look at fitting an integrated slimline dishwasher in this demo for me?

      It is a factory option that the customer would potentially like us to do.

      They have also asked for a quote to fit an electric oven, which I am working out a price for with Shaun.

      Thanks
      Kind Regards
      Sam Smith

        Activity

        Duncan Thomson created issue -
        Duncan Thomson made changes -
        Field Original Value New Value
        Park_Postcode EX19 8DW
        Park_Email warranty@surfbay.co.uk
        Park_Phone 01837 680100
        Park_Code SURF99
        Park_Key_Account No
        Park_Address Surf Bay Leisure (Winkleigh)
        Duncan Thomson made changes -
        Attachment parts required.png [ 404505 ]
        Hide
        Duncan Thomson added a comment -
        have seen we have a new slimline dishwasher in stock and the door can be reused as the handle is in the correct place for a dishwasher, have advised Sam to Quote the standard Swift dishwasher option price for this work. as this will only require labour to complete.
        Show
        Duncan Thomson added a comment - have seen we have a new slimline dishwasher in stock and the door can be reused as the handle is in the correct place for a dishwasher, have advised Sam to Quote the standard Swift dishwasher option price for this work. as this will only require labour to complete.
        Duncan Thomson made changes -
        Status Awaiting Quote [ 10006 ] Quotation supplied [ 10007 ]
        Manufacturer Swift
        Hide
        Duncan Thomson added a comment -
        Electrical supply is already in for a dishwasher, will only need a new trap and water tee feed iso.
        Show
        Duncan Thomson added a comment - Electrical supply is already in for a dishwasher, will only need a new trap and water tee feed iso.
        Duncan Thomson made changes -
        Status Quotation supplied [ 10007 ] Quotation accepted [ 10008 ]
        Duncan Thomson made changes -
        Status Quotation accepted [ 10008 ] Parts ordered [ 3 ]
        Duncan Thomson made changes -
        Status Parts ordered [ 3 ] Parts Recieved [ 10003 ]
        Assignee Duncan Thomson [ duncan ] Claire Folland [ claire ]
        Plot
        Parts From? Warranty Stock [ 10020 ]
        Duncan Thomson made changes -
        Status Parts Recieved [ 10003 ] Worksheet Issued [ 10004 ]
        Hide
        Claire Folland added a comment -
        complete by Duncan 4-8-25
        Show
        Claire Folland added a comment - complete by Duncan 4-8-25
        Claire Folland made changes -
        Times Scheduled 1
        Status Worksheet Issued [ 10004 ] Engineer Scheduled [ 10000 ]
        Assignee Claire Folland [ claire ] Duncan Thomson [ duncan ]
        Claire Folland made changes -
        Status Engineer Scheduled [ 10000 ] Resolved [ 5 ]
        Resolution Completed [ 1 ]
        made changes -
        Status Resolved [ 5 ] Complete [ 6 ]
        made changes -
        Resolution Completed [ 1 ]
        Status Complete [ 6 ] Reopened [ 4 ]
        made changes -
        Status Reopened [ 4 ] Awaiting Quote [ 10006 ]
        Transition Time In Source Status Execution Times Last Executer Last Execution Date
        Awaiting Quote Awaiting Quote Quotation supplied Quotation supplied
        14m 45s 1 Duncan Thomson 17/Jun/25 10:14 AM
        Quotation supplied Quotation supplied Quotation accepted Quotation accepted
        29d 6h 3m 1 Duncan Thomson 16/Jul/25 4:18 PM
        Quotation accepted Quotation accepted Parts ordered Parts ordered
        5s 1 Duncan Thomson 16/Jul/25 4:18 PM
        Parts ordered Parts ordered Parts Recieved Parts Recieved
        6s 1 Duncan Thomson 16/Jul/25 4:18 PM
        Parts Recieved Parts Recieved Worksheet Issued Worksheet Issued
        4s 1 Duncan Thomson 16/Jul/25 4:18 PM
        Worksheet Issued Worksheet Issued Engineer Scheduled Engineer Scheduled
        61d 19h 33m 1 Claire Folland 16/Sep/25 11:52 AM
        Engineer Scheduled Engineer Scheduled Resolved Resolved
        2s 1 Claire Folland 16/Sep/25 11:52 AM
        Resolved Resolved Complete Complete
        53d 23h 54m 1 09/Nov/25 10:46 AM
        Complete Complete Reopened Reopened
        6s 1 09/Nov/25 10:46 AM
        Reopened Reopened Awaiting Quote Awaiting Quote
        9s 1 09/Nov/25 10:46 AM

          People

          • Watchers:
            0 Start watching this issue

            Dates

            • Created:
              Updated: