Our Parks
  1. Our Parks
  2. SBHP-413

the front window sill has become “spongy” – we suspect from condensation

    Details

    • Type: Boiler (2 Weeks) Boiler (2 Weeks)
    • Status: Awaiting Quote
    • Priority: Normal Normal
    • Resolution: Unresolved
    • Labels:
      None
    • Park_Company:
       River Valley Country Park
    • Park_Code:
      RIVE02
    • Park_Postcode:
      TR20 9ER
    • Park_Email:
      rivervalley@surfbay.co.uk
    • Park_Phone:
      01736 763398
    • Plot:
      Yellow 18
    • Model:
      Everglade 2008
    • Stock_Number:
      27393
    • Status Colour:
      Awaiting Quote Awaiting Quote
    1. SBHP-413.pdf
      605 kB
      Ellie W
    1. screenshot-3.png
      93 kB
    2. screenshot-2.png
      89 kB
    3. screenshot-1.png
      91 kB
    4. Keith Russell 11.05.16 016.JPG
      1.99 MB
    5. Keith Russell 11.05.16 015.JPG
      1.72 MB
    6. Keith Russell 11.05.16 014.JPG
      1.64 MB
    7. Keith Russell 11.05.16 013.JPG
      2.18 MB
    8. Keith Russell 11.05.16 012.JPG
      2.76 MB
    9. Keith Russell 11.05.16 011.JPG
      2.52 MB
    10. Keith Russell 11.05.16 010.JPG
      2.33 MB
    11. Keith Russell 11.05.16 009.JPG
      2.12 MB
    12. Keith Russell 11.05.16 008.JPG
      2.24 MB
    13. CCF12052016_00000.jpg
      879 kB

      Activity

      Adrienne Barwell (Inactive) created issue -
      Adrienne Barwell (Inactive) made changes -
      Field Original Value New Value
      Model Derwent Everglade
      Plot Gold 12 Yellow 18
      Serial 2011
      Adrienne Barwell (Inactive) made changes -
      Model Everglade Everglade 2008
      Adrienne Barwell (Inactive) made changes -
      Summary the front window sill has become “spongey” – we suspect from condensation the front window sill has become “spongy” – we suspect from condensation
      Adrienne Barwell (Inactive) made changes -
      Status Awaiting Quote [ 10006 ] Quotation supplied [ 10007 ]
      Adrienne Barwell (Inactive) made changes -
      Status Quotation supplied [ 10007 ] Quotation accepted [ 10008 ]
      Adrienne Barwell (Inactive) made changes -
      Status Quotation accepted [ 10008 ] Parts ordered [ 3 ]
      Adrienne Barwell (Inactive) made changes -
      Status Parts ordered [ 3 ] Parts Recieved [ 10003 ]
      Plot
      Adrienne Barwell (Inactive) made changes -
      Status Parts Recieved [ 10003 ] Worksheet Issued [ 10004 ]
      Adrienne Barwell (Inactive) made changes -
      Attachment screenshot-1.png [ 116814 ]
      Hide
      Adrienne Barwell (Inactive) added a comment -
      worksheet issued
      Show
      Adrienne Barwell (Inactive) added a comment - worksheet issued
      Adrienne Barwell (Inactive) made changes -
      Attachment screenshot-2.png [ 116818 ]
      Adrienne Barwell (Inactive) made changes -
      Times Scheduled 1
      Status Worksheet Issued [ 10004 ] Engineer Scheduled [ 10000 ]
      Adrienne Barwell (Inactive) made changes -
      Work Scheduled 10/May/16
      Adrienne Barwell (Inactive) made changes -
      Attachment CCF12052016_00000.jpg [ 118064 ]
      Hide
      Adrienne Barwell (Inactive) added a comment -
      keith has advised that the damp has got in around the window, and panel joints just about each corner. The small section or wallboard above the cill is also rotten.

      Lower window will need to be removed and possibly top one as well. Woodwork needs to be assessed and repaired. New cill needs making and replacing
      side part to corner unit would have to be waxed
      Need cill board 1600x150 Bigger the better
      Small piece of wallboard creamy yellow
      timber for framework 30x30x6m
      Silicone
      Show
      Adrienne Barwell (Inactive) added a comment - keith has advised that the damp has got in around the window, and panel joints just about each corner. The small section or wallboard above the cill is also rotten. Lower window will need to be removed and possibly top one as well. Woodwork needs to be assessed and repaired. New cill needs making and replacing side part to corner unit would have to be waxed Need cill board 1600x150 Bigger the better Small piece of wallboard creamy yellow timber for framework 30x30x6m Silicone
      Adrienne Barwell (Inactive) made changes -
      Attachment screenshot-3.png [ 118067 ]
      Adrienne Barwell (Inactive) made changes -
      Times Scheduled 1 2
      Status Engineer Scheduled [ 10000 ] Engineer Scheduled [ 10000 ]
      Work Scheduled 10/May/16 23/May/16
      Plot
      Hide
      Adrienne Barwell (Inactive) added a comment -
      I need to speak to Steve to see what we have in stock for this
      Show
      Adrienne Barwell (Inactive) added a comment - I need to speak to Steve to see what we have in stock for this
      Adrienne Barwell (Inactive) made changes -
      Attachment Keith Russell 11.05.16 008.JPG [ 118265 ]
      Attachment Keith Russell 11.05.16 009.JPG [ 118266 ]
      Attachment Keith Russell 11.05.16 010.JPG [ 118267 ]
      Attachment Keith Russell 11.05.16 011.JPG [ 118268 ]
      Attachment Keith Russell 11.05.16 012.JPG [ 118269 ]
      Attachment Keith Russell 11.05.16 013.JPG [ 118270 ]
      Attachment Keith Russell 11.05.16 014.JPG [ 118271 ]
      Attachment Keith Russell 11.05.16 015.JPG [ 118272 ]
      Attachment Keith Russell 11.05.16 016.JPG [ 118273 ]
      Adrienne Barwell (Inactive) made changes -
      Times Scheduled 2 3
      Status Engineer Scheduled [ 10000 ] Engineer Scheduled [ 10000 ]
      Work Scheduled 23/May/16 25/May/16
      Plot
      Hide
      Ellie W (Inactive) added a comment -
      Worksheet returned, work completed by Steve
      Show
      Ellie W (Inactive) added a comment - Worksheet returned, work completed by Steve
      Ellie W (Inactive) made changes -
      Attachment SBHP-413.pdf [ 120293 ]
      Ellie W (Inactive) made changes -
      Status Engineer Scheduled [ 10000 ] Resolved [ 5 ]
      Resolution Completed [ 1 ]
      Ellie W (Inactive) made changes -
      Status Resolved [ 5 ] Complete [ 6 ]
      made changes -
      Resolution Completed [ 1 ]
      Status Complete [ 6 ] Reopened [ 4 ]
      made changes -
      Status Reopened [ 4 ] Awaiting Quote [ 10006 ]
      Transition Time In Source Status Execution Times Last Executer Last Execution Date
      Awaiting Quote Awaiting Quote Quotation supplied Quotation supplied
      12m 43s 1 Adrienne Barwell (Inactive) 03/May/16 2:07 PM
      Quotation supplied Quotation supplied Quotation accepted Quotation accepted
      1s 1 Adrienne Barwell (Inactive) 03/May/16 2:07 PM
      Quotation accepted Quotation accepted Parts ordered Parts ordered
      4s 1 Adrienne Barwell (Inactive) 03/May/16 2:07 PM
      Parts ordered Parts ordered Parts Recieved Parts Recieved
      2s 1 Adrienne Barwell (Inactive) 03/May/16 2:07 PM
      Parts Recieved Parts Recieved Worksheet Issued Worksheet Issued
      5s 1 Adrienne Barwell (Inactive) 03/May/16 2:07 PM
      Worksheet Issued Worksheet Issued Engineer Scheduled Engineer Scheduled
      3d 1h 32m 1 Adrienne Barwell (Inactive) 06/May/16 3:39 PM
      Engineer Scheduled Engineer Scheduled Engineer Scheduled Engineer Scheduled
      16d 17h 20m 2 Adrienne Barwell (Inactive) 23/May/16 9:00 AM
      Engineer Scheduled Engineer Scheduled Resolved Resolved
      10d 2h 17m 1 temp 02/Jun/16 11:17 AM
      Resolved Resolved Complete Complete
      1s 1 temp 02/Jun/16 11:17 AM
      Complete Complete Reopened Reopened
      3571d 2h 13m 1 13/Mar/26 12:31 PM
      Reopened Reopened Awaiting Quote Awaiting Quote
      7s 1 13/Mar/26 12:31 PM

        People

        • Assignee:
          Adrienne Barwell (Inactive)
          Reporter:
          Adrienne Barwell (Inactive)
          Participants:
        • Watchers:
          0 Start watching this issue

          Dates

          • Due:
            Created:
            Updated:
            Work Scheduled: