Details

    • Type: Small Fittings (8 Weeks) Small Fittings (8 Weeks)
    • Status: Complete
    • Priority: Critical Critical
    • Resolution: Completed
    • Labels:
      None
    • Customer Code:
      WEBL01
    • Park:
      WEBLANDS FARM
    • Postcode:
      TQ10 9EX
    • Responsibility:
      SurfBay Attending
    • Serial:
      6091H
    • Model:
      MOSELLE
    • Size:
      35 X 12
    • Status Colour:
      Complete Complete
    • Park_Company:
       Not defined
    • SLA Status:

      Description

      See photo - This van was a demo before it went to site: I need to talk to Darren and see what he wants us to do. Keith has removed most of the mark but he says it is not perfect.

        Activity

        Linda Trunkfield (Inactive) created issue -
        Linda Trunkfield (Inactive) made changes -
        Field Original Value New Value
        Summary PDI TAPE MARK ON CARPET. PDI TAPE MARK ON LOUNGE CARPET.
        Linda Trunkfield (Inactive) made changes -
        Description See photo - This van was a demo before it went to site: I need to talk to Darren and see what he wants us to do.

        If Darren wants this done I will use SS FLOORING.
        See photo - This van was a demo before it went to site: I need to talk to Darren and see what he wants us to do. Keith has removed most of the mark but he says it is not perfect.

        If Darren wants this done I will use SS FLOORING.
        Linda Trunkfield (Inactive) made changes -
        Attachment keiths pics 10-06-11 070.jpg [ 16690 ]
        Hide
        Linda Trunkfield (Inactive) added a comment -
        I have spoken to Darren and he has said that he would like us to go out and try to clean the mark, I will do a worksheet for us to do this.
        Show
        Linda Trunkfield (Inactive) added a comment - I have spoken to Darren and he has said that he would like us to go out and try to clean the mark, I will do a worksheet for us to do this.
        Linda Trunkfield (Inactive) made changes -
        Status Open [ 1 ] Submitted [ 10001 ]
        Description See photo - This van was a demo before it went to site: I need to talk to Darren and see what he wants us to do. Keith has removed most of the mark but he says it is not perfect.

        If Darren wants this done I will use SS FLOORING.
        See photo - This van was a demo before it went to site: I need to talk to Darren and see what he wants us to do. Keith has removed most of the mark but he says it is not perfect.

        Linda Trunkfield (Inactive) made changes -
        Status Submitted [ 10001 ] Acknowledged [ 10005 ]
        Linda Trunkfield (Inactive) made changes -
        Status Acknowledged [ 10005 ] Parts ordered [ 3 ]
        Linda Trunkfield (Inactive) made changes -
        Status Parts ordered [ 3 ] Parts Recieved [ 10003 ]
        Linda Trunkfield (Inactive) made changes -
        Status Parts Recieved [ 10003 ] Worksheet Issued [ 10004 ]
        Adrienne Barwell (Inactive) made changes -
        Work Scheduled 4/Jul/11
        Status Worksheet Issued [ 10004 ] Engineer Scheduled [ 10000 ]
        Hide
        Adrienne Barwell (Inactive) added a comment -
        comp by steve
        Show
        Adrienne Barwell (Inactive) added a comment - comp by steve
        Adrienne Barwell (Inactive) made changes -
        Attachment CCF08072011_00010.jpg [ 17283 ]
        Adrienne Barwell (Inactive) made changes -
        Status Engineer Scheduled [ 10000 ] Resolved [ 5 ]
        Resolution Completed [ 1 ]
        Adrienne Barwell (Inactive) made changes -
        Status Resolved [ 5 ] Complete [ 6 ]
        Mark Lock (Inactive) made changes -
        Workflow Surfbay [ 48198 ] Copy of Surfbay [ 54210 ]
        Mark Lock (Inactive) made changes -
        Workflow Copy of Surfbay [ 54210 ] Surfbay [ 61488 ]
        Mark Lock (Inactive) made changes -
        Workflow Surfbay [ 61488 ] Manufacturers ver 2.0 [ 88600 ]
        Adrienne Barwell (Inactive) made changes -
        Workflow Manufacturers ver 2.0 [ 88600 ] Manufacturers ver 2.1 [ 127693 ]
        Adrienne Barwell (Inactive) made changes -
        Workflow Manufacturers ver 2.1 [ 127693 ] Manufacturers ver 2.2 [ 145093 ]
        Transition Time In Source Status Execution Times Last Executer Last Execution Date
        Open Open Submitted Submitted
        5d 1h 15m 1 Linda Trunkfield (Inactive) 15/Jun/11 1:11 PM
        Submitted Submitted Acknowledged Acknowledged
        5s 1 Linda Trunkfield (Inactive) 15/Jun/11 1:11 PM
        Acknowledged Acknowledged Parts ordered Parts ordered
        4s 1 Linda Trunkfield (Inactive) 15/Jun/11 1:11 PM
        Parts ordered Parts ordered Parts Recieved Parts Recieved
        3s 1 Linda Trunkfield (Inactive) 15/Jun/11 1:11 PM
        Parts Recieved Parts Recieved Worksheet Issued Worksheet Issued
        2s 1 Linda Trunkfield (Inactive) 15/Jun/11 1:11 PM
        Worksheet Issued Worksheet Issued Engineer Scheduled Engineer Scheduled
        12d 21h 14m 1 Adrienne Barwell (Inactive) 28/Jun/11 10:26 AM
        Engineer Scheduled Engineer Scheduled Resolved Resolved
        10d 6h 10m 1 Adrienne Barwell (Inactive) 08/Jul/11 4:37 PM
        Resolved Resolved Complete Complete
        5s 1 Adrienne Barwell (Inactive) 08/Jul/11 4:37 PM

          People

          • Watchers:
            0 Start watching this issue

            Dates

            • Due:
              Created:
              Updated:
              Resolved:
              Work Scheduled: