Swift
  1. Swift
  2. SWIFT-3920

The site have advised that there is a curvature in the floor in front of the main door.

    Details

    • Type: Floor (8 Weeks) Floor (8 Weeks)
    • Status: Complete
    • Priority: Critical Critical
    • Resolution: Completed
    • Labels:
      None
    • Customer Code:
      gunv01
    • Park:
      Gunvenna
    • Postcode:
      PL27 6QN
    • Responsibility:
      Manufacturer Attending
    • Serial:
      10760H
    • Model:
      Adventurer
    • Size:
      35 x 12
    • ID Number:
      sbh002664
    • Status Colour:
      Complete Complete
    • Park_Company:
       Not defined
    • SLA Status:

      Description

      There is a curvature in the floor in front of the door the site have said that the chassis looks ok and they think it could be the timbers they have put a level on it and it is approx 12mm out falling away from the middle of the floor to doorway.

      I have spoken to Marcus today and he has advised that he thinks this could be the timbers not the chassis
      1. screenshot-1.jpg
        143 kB
      2. screenshot-10.jpg
        164 kB
      3. screenshot-11.jpg
        128 kB
      4. screenshot-12.jpg
        152 kB
      5. screenshot-13.jpg
        153 kB
      6. screenshot-14.jpg
        168 kB
      7. screenshot-15.jpg
        294 kB
      8. screenshot-16.jpg
        220 kB
      9. screenshot-17.jpg
        165 kB
      10. screenshot-18.jpg
        172 kB
      11. screenshot-19.jpg
        172 kB
      12. screenshot-2.jpg
        138 kB
      13. screenshot-3.jpg
        160 kB
      14. screenshot-4.jpg
        146 kB
      15. screenshot-5.jpg
        171 kB
      16. screenshot-6.jpg
        158 kB
      17. screenshot-7.jpg
        137 kB
      18. screenshot-8.jpg
        241 kB

        Activity

        Linda Trunkfield (Inactive) created issue -
        Linda Trunkfield (Inactive) made changes -
        Field Original Value New Value
        Summary The site have advised that there ia a curviture in the floor in front of the main door. The site have advised that there ia a curvature in the floor in front of the main door.
        Due Date 2012-06-22 00:00:00.0 2012-08-03 00:00:00.0
        Issue Type PDI (2 weeks) [ 15 ] Floor (8 Weeks) [ 24 ]
        Description There is a curvature in the floor in front of the door the site
        Linda Trunkfield (Inactive) made changes -
        Description There is a curvature in the floor in front of the door the site There is a curvature in the floor in front of the door the site have said that the chassis looks ok and they think it could be the timbers they have put a level on it and it is approx 12mm out falling away from the middle of the floor to doorway.
        Linda Trunkfield (Inactive) made changes -
        Summary The site have advised that there ia a curvature in the floor in front of the main door. The site have advised that there iS a curvature in the floor in front of the main door.
        Description There is a curvature in the floor in front of the door the site have said that the chassis looks ok and they think it could be the timbers they have put a level on it and it is approx 12mm out falling away from the middle of the floor to doorway. There is a curvature in the floor in front of the door the site have said that the chassis looks ok and they think it could be the timbers they have put a level on it and it is approx 12mm out falling away from the middle of the floor to doorway.

        I have spoken to Marcus today and he has advised that he thinks this could be the timbers not the chassis
        Linda Trunkfield (Inactive) made changes -
        ID Number sbh002664
        Status Open [ 1 ] Submitted [ 10001 ]
        Adrienne Barwell (Inactive) made changes -
        Status Submitted [ 10001 ] Query from Manufacturer [ 10011 ]
        Hide
        Adrienne Barwell (Inactive) added a comment - - edited
        Swift have requested photographs - left a message for Steve on his mobile asking him to send through photographs
        Show
        Adrienne Barwell (Inactive) added a comment - - edited Swift have requested photographs - left a message for Steve on his mobile asking him to send through photographs
        Adrienne Barwell (Inactive) made changes -
        Status Query from Manufacturer [ 10011 ] Acknowledged [ 10005 ]
        Hide
        Adrienne Barwell (Inactive) added a comment -
        Swift advise that they will arrange an engineer to visit
        Show
        Adrienne Barwell (Inactive) added a comment - Swift advise that they will arrange an engineer to visit
        Adrienne Barwell (Inactive) made changes -
        Category SurfBay Attending Manufacturer Attending
        Lorraine Pryor (Inactive) made changes -
        Attachment screenshot-1.jpg [ 28189 ]
        Hide
        Lorraine Pryor (Inactive) added a comment -
        Swift have received this and an in the process of arranging an engineer.
        Show
        Lorraine Pryor (Inactive) added a comment - Swift have received this and an in the process of arranging an engineer.
        Lorraine Pryor (Inactive) made changes -
        Attachment screenshot-2.jpg [ 28190 ]
        Lorraine Pryor (Inactive) made changes -
        Status Acknowledged [ 10005 ] Parts ordered [ 3 ]
        Lorraine Pryor (Inactive) made changes -
        Status Parts ordered [ 3 ] Parts Recieved [ 10003 ]
        Lorraine Pryor (Inactive) made changes -
        Status Parts Recieved [ 10003 ] Worksheet Issued [ 10004 ]
        Hide
        Lorraine Pryor (Inactive) added a comment -
        Called swift spoke to Merri, she advised me that the swift engineer will be going to this
        w/c 23rd July. I have called park to advise paul, he wasn't there so left a message with an gentleman
        Show
        Lorraine Pryor (Inactive) added a comment - Called swift spoke to Merri, she advised me that the swift engineer will be going to this w/c 23rd July. I have called park to advise paul, he wasn't there so left a message with an gentleman
        Lorraine Pryor (Inactive) made changes -
        Work Scheduled 23/Jul/12
        Status Worksheet Issued [ 10004 ] Engineer Scheduled [ 10000 ]
        Hide
        Lorraine Pryor (Inactive) added a comment -
        swift have sent a e-mail say that the will be sending an engineer w/c 23rd July, did say for what issue, but the park are aware that swift are sending someone w/c 23rd july
        Show
        Lorraine Pryor (Inactive) added a comment - swift have sent a e-mail say that the will be sending an engineer w/c 23rd July, did say for what issue, but the park are aware that swift are sending someone w/c 23rd july
        Lorraine Pryor (Inactive) made changes -
        Attachment screenshot-3.jpg [ 28958 ]
        Adrienne Barwell (Inactive) made changes -
        Priority Normal [ 21 ] Over 6 Weeks [ 27 ]
        Hide
        Lorraine Pryor (Inactive) added a comment -
        Swift sent a reply to confirm its for the sloping roof.
        Show
        Lorraine Pryor (Inactive) added a comment - Swift sent a reply to confirm its for the sloping roof.
        Lorraine Pryor (Inactive) made changes -
        Attachment screenshot-4.jpg [ 29398 ]
        Hide
        Lorraine Pryor (Inactive) added a comment - - edited
        Paul Diamond called from the park checking if the engineers are still attending to this issue this week.
        Told Paul that we are just given a w/c date, Ive just called swift spoke to ref Merri, she cant get hold of the engineers to find out if they are going tonight, they make there way back on friday to swift with the work sheets..
        Merri said that if she does get hold of the engineers she will call me back
        I calledl Paul back to up date him, I've explained that the engineer only work mon to thur and they make they way back on fiday, so its looking like it wont be this week.. l have advised him that they go on shut down for 2/3 weeks now so it might not be till swift return.
        Show
        Lorraine Pryor (Inactive) added a comment - - edited Paul Diamond called from the park checking if the engineers are still attending to this issue this week. Told Paul that we are just given a w/c date, Ive just called swift spoke to ref Merri, she cant get hold of the engineers to find out if they are going tonight, they make there way back on friday to swift with the work sheets.. Merri said that if she does get hold of the engineers she will call me back I calledl Paul back to up date him, I've explained that the engineer only work mon to thur and they make they way back on fiday, so its looking like it wont be this week.. l have advised him that they go on shut down for 2/3 weeks now so it might not be till swift return.
        Lorraine Pryor (Inactive) made changes -
        Attachment screenshot-5.jpg [ 29648 ]
        Hide
        Lorraine Pryor (Inactive) added a comment -
        Swift have sent an e-mail to say that the engineer did get there and they have re- scheduled the work for w/c 17th sep.. (8 weeks later)..
        I called Sam and she explained that this is the next time that they will be in the area.
        I said that the park will not be happy to wait that long, sam said if I e-mail her back then when the engineers come back from the shut down she would then see if she can get anone there sooner.
        So I have sent her e-mail back asking if they can get an engineer any sooner...
        I will e-mail the park with the w/c date and tell them that we are trying to see if we can get a date prior to this...
        Show
        Lorraine Pryor (Inactive) added a comment - Swift have sent an e-mail to say that the engineer did get there and they have re- scheduled the work for w/c 17th sep.. (8 weeks later).. I called Sam and she explained that this is the next time that they will be in the area. I said that the park will not be happy to wait that long, sam said if I e-mail her back then when the engineers come back from the shut down she would then see if she can get anone there sooner. So I have sent her e-mail back asking if they can get an engineer any sooner... I will e-mail the park with the w/c date and tell them that we are trying to see if we can get a date prior to this...
        Lorraine Pryor (Inactive) made changes -
        Attachment screenshot-6.jpg [ 29649 ]
        Lorraine Pryor (Inactive) made changes -
        Account Gunvenna Caravan Park [ 6ab9dc1f-466f-a267-9f9d-4ec4f11c1ea3 ]
        Lorraine Pryor (Inactive) made changes -
        Contact Diamond Marcus [ b736f89f-6d17-5bc0-b5b2-4ec4f15d1ccf ]
        Lorraine Pryor (Inactive) made changes -
        Attachment screenshot-7.jpg [ 29650 ]
        Hide
        Adrienne Barwell (Inactive) added a comment -
        E-mailed James Turner, regarding the re-schedule date awaiting his response
        Show
        Adrienne Barwell (Inactive) added a comment - E-mailed James Turner, regarding the re-schedule date awaiting his response
        Adrienne Barwell (Inactive) made changes -
        Attachment screenshot-8.jpg [ 29651 ]
        Adrienne Barwell (Inactive) made changes -
        Status Engineer Scheduled [ 10000 ] Engineer Visit Rescheduled [ 10010 ]
        Work Scheduled 23/Jul/12 17/Sep/12
        Hide
        Lorraine Pryor (Inactive) added a comment -
        Sam has now come back to me to say that she will be sending an engineer w/c 20th aug..
        I will call the park to update them.
        Show
        Lorraine Pryor (Inactive) added a comment - Sam has now come back to me to say that she will be sending an engineer w/c 20th aug.. I will call the park to update them.
        Lorraine Pryor (Inactive) made changes -
        Attachment screenshot-9.jpg [ 29654 ]
        Adrienne Barwell (Inactive) made changes -
        Priority Over 6 Weeks [ 27 ] Critical [ 24 ]
        Lorraine Pryor (Inactive) made changes -
        Attachment screenshot-10.jpg [ 29657 ]
        Hide
        Adrienne Barwell (Inactive) added a comment -
        Spoke to Marcus at Gunvenna who has advised that a customer has put a deposit down for this unit but will not pay the £5000.00 balance until the issues are cleared up. He therefore feels that either Swift pay the £5000.00 which he will repay when he receives it from the customer, or that he charges Swift interest on £5000.00 or he rejects the unit and Swift pay to replace the van and pay for the desiting and resiting of a new unit. I will speak to Michael and get back to him
        Show
        Adrienne Barwell (Inactive) added a comment - Spoke to Marcus at Gunvenna who has advised that a customer has put a deposit down for this unit but will not pay the £5000.00 balance until the issues are cleared up. He therefore feels that either Swift pay the £5000.00 which he will repay when he receives it from the customer, or that he charges Swift interest on £5000.00 or he rejects the unit and Swift pay to replace the van and pay for the desiting and resiting of a new unit. I will speak to Michael and get back to him
        Hide
        Lorraine Pryor (Inactive) added a comment -
        My e-mail bounced back, so Ive sent anothe one re swift engineer attending w/c 20th aug
        Show
        Lorraine Pryor (Inactive) added a comment - My e-mail bounced back, so Ive sent anothe one re swift engineer attending w/c 20th aug
        Lorraine Pryor (Inactive) made changes -
        Attachment screenshot-11.jpg [ 29661 ]
        Hide
        Adrienne Barwell (Inactive) added a comment -
        Spoke to Marcus and asked if he would mind putting something on e-mail to Michael - he said that he would send the e-mail by lunchtime
        Show
        Adrienne Barwell (Inactive) added a comment - Spoke to Marcus and asked if he would mind putting something on e-mail to Michael - he said that he would send the e-mail by lunchtime
        Lorraine Pryor (Inactive) made changes -
        Attachment screenshot-12.jpg [ 29664 ]
        Lorraine Pryor (Inactive) made changes -
        Contact Diamond Marcus [ b736f89f-6d17-5bc0-b5b2-4ec4f15d1ccf ] Diamond James [ 3f836a33-e80b-fc89-419b-4ec4f19a9b82 ]
        Lorraine Pryor (Inactive) made changes -
        Contact Diamond James [ 3f836a33-e80b-fc89-419b-4ec4f19a9b82 ] Diamond Marcus [ b736f89f-6d17-5bc0-b5b2-4ec4f15d1ccf ]
        Hide
        Lorraine Pryor (Inactive) added a comment -
        All the e-mail that I have tried to send to Marcus are bouncing back?
        Will need to get the correct e-mail address.
        Show
        Lorraine Pryor (Inactive) added a comment - All the e-mail that I have tried to send to Marcus are bouncing back? Will need to get the correct e-mail address.
        Lorraine Pryor (Inactive) made changes -
        Attachment screenshot-9.jpg [ 29654 ]
        Lorraine Pryor (Inactive) made changes -
        Attachment screenshot-13.jpg [ 29668 ]
        Hide
        Lorraine Pryor (Inactive) added a comment -
        The correct e-mail is marcusdiamond@btconnect.com, I will see how we can update this on Jira
        Show
        Lorraine Pryor (Inactive) added a comment - The correct e-mail is marcusdiamond@btconnect.com , I will see how we can update this on Jira
        Hide
        Lorraine Pryor (Inactive) added a comment -
        I have gone into Jira and change the e-mail address to show Marcus correct one.
        Show
        Lorraine Pryor (Inactive) added a comment - I have gone into Jira and change the e-mail address to show Marcus correct one.
        Hide
        Lorraine Pryor (Inactive) added a comment -
        Marcus has sent a e-mail to say that the customer is withholding the £5000.00 until this issue is resolved and they are happy with it.
        Show
        Lorraine Pryor (Inactive) added a comment - Marcus has sent a e-mail to say that the customer is withholding the £5000.00 until this issue is resolved and they are happy with it.
        Lorraine Pryor (Inactive) made changes -
        Attachment screenshot-14.jpg [ 29709 ]
        Adrienne Barwell (Inactive) made changes -
        Attachment screenshot-15.jpg [ 29825 ]
        Adrienne Barwell (Inactive) made changes -
        Work Scheduled 17/Sep/12 20/Aug/12
        Status Engineer Visit Rescheduled [ 10010 ] Engineer Visit Rescheduled [ 10010 ]
        Hide
        Linda Trunkfield (Inactive) added a comment -
        I spoke to Meri and she advised that they will not be able to give us a firm date until the Monday 20-08-12.
        Show
        Linda Trunkfield (Inactive) added a comment - I spoke to Meri and she advised that they will not be able to give us a firm date until the Monday 20-08-12.
        Hide
        Adrienne Barwell (Inactive) added a comment -
        I have e-mailed Laura asking for an urgent visit date rather than a week commencing date
        Show
        Adrienne Barwell (Inactive) added a comment - I have e-mailed Laura asking for an urgent visit date rather than a week commencing date
        Adrienne Barwell (Inactive) made changes -
        Summary The site have advised that there iS a curvature in the floor in front of the main door. The site have advised that there is a curvature in the floor in front of the main door.
        Adrienne Barwell (Inactive) made changes -
        Attachment screenshot-16.jpg [ 30539 ]
        Hide
        Adrienne Barwell (Inactive) added a comment -
        I have spoken to Laura and she has advised that it will probably be Tuesday 21st P.M however if the first job runs over it will be Wednesday 22nd. she will confirm this on Monday 20th
        Show
        Adrienne Barwell (Inactive) added a comment - I have spoken to Laura and she has advised that it will probably be Tuesday 21st P.M however if the first job runs over it will be Wednesday 22nd. she will confirm this on Monday 20th
        Hide
        Adrienne Barwell (Inactive) added a comment -
        Updated Marcus at Gunvenna
        Show
        Adrienne Barwell (Inactive) added a comment - Updated Marcus at Gunvenna
        Adrienne Barwell (Inactive) made changes -
        Attachment screenshot-17.jpg [ 30540 ]
        Hide
        Adrienne Barwell (Inactive) added a comment -
        Marcus from Gunvenna has called because guys have turned up to carry out the repair on Swift panels, they are worried that this means they won't get the engineer to do the floor this week. I have explained that they are a different crew of men and the Swift engineer will still turn up, I advised that I would give Swift a call to confirm and then ring back
        Show
        Adrienne Barwell (Inactive) added a comment - Marcus from Gunvenna has called because guys have turned up to carry out the repair on Swift panels, they are worried that this means they won't get the engineer to do the floor this week. I have explained that they are a different crew of men and the Swift engineer will still turn up, I advised that I would give Swift a call to confirm and then ring back
        Hide
        Adrienne Barwell (Inactive) added a comment -
        Paul from Gunvenna called, Linda explained that I had just had the same conversation with Marcus and that I am ringing Swift to double check
        Show
        Adrienne Barwell (Inactive) added a comment - Paul from Gunvenna called, Linda explained that I had just had the same conversation with Marcus and that I am ringing Swift to double check
        Hide
        Adrienne Barwell (Inactive) added a comment -
        Rang Laura but she was on the phone, left a message on her answerphone
        Show
        Adrienne Barwell (Inactive) added a comment - Rang Laura but she was on the phone, left a message on her answerphone
        Hide
        Adrienne Barwell (Inactive) added a comment -
        Laura confirmed that it will be Andy from Swift attending and that it is his next job after Harlyn Sands. He has been told not to leave the job until he has sorted the problem. I have updated Marcus
        Show
        Adrienne Barwell (Inactive) added a comment - Laura confirmed that it will be Andy from Swift attending and that it is his next job after Harlyn Sands. He has been told not to leave the job until he has sorted the problem. I have updated Marcus
        Hide
        Adrienne Barwell (Inactive) added a comment -
        Andy (swift engineer) visited site and put extra supports underneath the unit and screwed down floor. Site have signed off his worksheet as complete
        Show
        Adrienne Barwell (Inactive) added a comment - Andy (swift engineer) visited site and put extra supports underneath the unit and screwed down floor. Site have signed off his worksheet as complete
        Adrienne Barwell (Inactive) made changes -
        Status Engineer Visit Rescheduled [ 10010 ] Resolved [ 5 ]
        Resolution Completed [ 1 ]
        Adrienne Barwell (Inactive) made changes -
        Status Resolved [ 5 ] Complete [ 6 ]
        Lorraine Pryor (Inactive) made changes -
        Resolution Completed [ 1 ]
        Status Complete [ 6 ] Reopened [ 4 ]
        Lorraine Pryor (Inactive) made changes -
        Attachment screenshot-18.jpg [ 30972 ]
        Hide
        Lorraine Pryor (Inactive) added a comment -
        swift have sent an e-mail to say that they have completed the work, levelled van up and put axle stands along the doorside.
        Show
        Lorraine Pryor (Inactive) added a comment - swift have sent an e-mail to say that they have completed the work, levelled van up and put axle stands along the doorside.
        Lorraine Pryor (Inactive) made changes -
        Attachment screenshot-19.jpg [ 30973 ]
        Lorraine Pryor (Inactive) made changes -
        Status Reopened [ 4 ] Complete [ 6 ]
        Resolution Completed [ 1 ]
        Mark Lock (Inactive) made changes -
        Workflow Surfbay [ 67266 ] Manufacturers ver 2.0 [ 87213 ]
        Adrienne Barwell (Inactive) made changes -
        Workflow Manufacturers ver 2.0 [ 87213 ] Manufacturers ver 2.1 [ 130817 ]
        Adrienne Barwell (Inactive) made changes -
        Workflow Manufacturers ver 2.1 [ 130817 ] Manufacturers ver 2.2 [ 148076 ]
        Transition Time In Source Status Execution Times Last Executer Last Execution Date
        Open Open Submitted Submitted
        5h 58m 1 Linda Trunkfield (Inactive) 08/Jun/12 5:08 PM
        Submitted Submitted Removed Status Removed Status
        9d 21h 48m 1 Adrienne Barwell (Inactive) 18/Jun/12 2:56 PM
        Removed Status Removed Status Acknowledged Acknowledged
        4d 1h 33m 1 Adrienne Barwell (Inactive) 22/Jun/12 4:29 PM
        Acknowledged Acknowledged Parts ordered Parts ordered
        16d 22h 22m 1 Lorraine Pryor (Inactive) 09/Jul/12 2:52 PM
        Parts ordered Parts ordered Parts Recieved Parts Recieved
        3s 1 Lorraine Pryor (Inactive) 09/Jul/12 2:52 PM
        Parts Recieved Parts Recieved Worksheet Issued Worksheet Issued
        1s 1 Lorraine Pryor (Inactive) 09/Jul/12 2:52 PM
        Worksheet Issued Worksheet Issued Engineer Scheduled Engineer Scheduled
        1m 5s 1 Lorraine Pryor (Inactive) 09/Jul/12 2:53 PM
        Engineer Scheduled Engineer Scheduled Engineer Visit Rescheduled  Engineer Visit Rescheduled
        21d 19h 48m 1 Adrienne Barwell (Inactive) 31/Jul/12 10:42 AM
        Engineer Visit Rescheduled  Engineer Visit Rescheduled Engineer Visit Rescheduled  Engineer Visit Rescheduled
        9d 2h 42m 1 Adrienne Barwell (Inactive) 09/Aug/12 1:24 PM
        Engineer Visit Rescheduled  Engineer Visit Rescheduled Resolved Resolved
        12d 19h 26m 1 Adrienne Barwell (Inactive) 22/Aug/12 8:50 AM
        Resolved Resolved Complete Complete
        6s 1 Adrienne Barwell (Inactive) 22/Aug/12 8:50 AM
        Complete Complete Reopened Reopened
        7d 41m 1 Lorraine Pryor (Inactive) 29/Aug/12 9:31 AM
        Reopened Reopened Complete Complete
        5m 22s 1 Lorraine Pryor (Inactive) 29/Aug/12 9:37 AM

          People

          • Watchers:
            3 Start watching this issue

            Dates

            • Due:
              Created:
              Updated:
              Resolved:
              Work Scheduled: