Swift
  1. Swift
  2. SWIFT-7544

Main front door has a gap at the top when locked

    Details

    • Type: Ext Doors & Windows (4 weeks) Ext Doors & Windows (4 weeks)
    • Status: Complete
    • Priority: Normal Normal
    • Resolution: Completed
    • Labels:
      None
    • Customer Code:
      WAVE01
    • Park:
      Waverley
    • Postcode:
      PO32 6AW
    • Responsibility:
      Manufacturer Attending
    • Hire_or_Retail:
      Hire_fleet
    • Serial:
      15051h
    • Manufacturer:
      Swift
    • Model:
      Burgundy
    • Size:
      32x10
    • ID Number:
      SBH004166
    • Status Colour:
      Complete Complete
    • Stock_Number:
      29594
    • Times Scheduled:
      2
    • Park_Company:
       Waverley Park Holiday Centre
    • Park_Postcode:
      PO32 6AW
    • Park_Contact:
      Mr P Adams
    • Park_Phone:
      1983293452
    • Park_Email:
      sue@waverley-park.co.uk
    • Park_Code:
      WAVE01
    • Additional Contact Details:
      Peter 01983293452
    • Park_Key_Account:
      No
    • SLA Status:
    1. screenshot-4.jpg
      207 kB
    2. screenshot-3.jpg
      182 kB
    3. screenshot-2.jpg
      143 kB
    4. screenshot-1.jpg
      198 kB
    5. 6.1.15.jpg
      182 kB
    6. 27.01.15 complted by swift .jpg
      210 kB
    7. 22.01.15 swift engineer date.jpg
      212 kB
    8. 07.01.15 authroised claim.jpg
      60 kB

      Activity

      Hide
      Lorraine Pryor (Inactive) added a comment -
      This has now been complted by swift, so I will close this off
      Show
      Lorraine Pryor (Inactive) added a comment - This has now been complted by swift, so I will close this off
      Hide
      Lorraine Pryor (Inactive) added a comment -
      Checked on swift and it shows that an engineer is due to go w/c 19.01.15 .
      screen shot attached
      Show
      Lorraine Pryor (Inactive) added a comment - Checked on swift and it shows that an engineer is due to go w/c 19.01.15 . screen shot attached
      Hide
      Lorraine Pryor (Inactive) added a comment -
      Mo has stated that swift have made a provisional date for w/c 16.02.15.
      She hasn't emailed the park, so I will do that today and move them on to this date on jira
      Show
      Lorraine Pryor (Inactive) added a comment - Mo has stated that swift have made a provisional date for w/c 16.02.15. She hasn't emailed the park, so I will do that today and move them on to this date on jira
      Hide
      Maureen Hooper (Inactive) added a comment -
      Provisional date for engineer visist w/c 16.2.15
      Show
      Maureen Hooper (Inactive) added a comment - Provisional date for engineer visist w/c 16.2.15

        People

        • Watchers:
          0 Start watching this issue

          Dates

          • Due:
            Created:
            Updated:
            Resolved:
            Work Scheduled: