Details

    • Type: Beds (8 Weeks) Beds (8 Weeks)
    • Status: Complete
    • Priority: Normal Normal
    • Resolution: Completed
    • Labels:
      None
    • Customer Code:
      BERR02
    • Park:
      Berry Barton
    • Postcode:
      EX12 3DB
    • Responsibility:
      Manufacturer Attending
    • Hire_or_Retail:
      Retail
    • Serial:
      wb5281/002
    • Model:
      Granada
    • Size:
      35x12
    • ID Number:
      336716
    • Status Colour:
      Complete Complete
    • Park_Company:
       Not defined
    • SLA Status:

      Description

      Mr Fox 01384 371480
      1. CCF19042013_00001.pdf
        437 kB
        Claire Folland
      1. screenshot-1.jpg
        171 kB
      2. screenshot-2.jpg
        135 kB
      3. screenshot-3.jpg
        136 kB

        Activity

        Claire Folland created issue -
        Claire Folland made changes -
        Field Original Value New Value
        Attachment CCF19042013_00001.pdf [ 41685 ]
        Claire Folland made changes -
        Summary CLONE - Window cill in main bedroom right hand side swelling up main bedroom bed base warped right hand side
        Issue Type Wallboards/Ceiling Boards (8 Weeks) [ 6 ] Beds (8 Weeks) [ 10 ]
        Hide
        Claire Folland added a comment -
        submitted into willerby
        Show
        Claire Folland added a comment - submitted into willerby
        Claire Folland made changes -
        Status Open [ 1 ] Submitted [ 10001 ]
        Claire Folland made changes -
        ID Number 336716
        Claire Folland made changes -
        Attachment screenshot-1.jpg [ 41701 ]
        Claire Folland made changes -
        Status Submitted [ 10001 ] Acknowledged [ 10005 ]
        Hide
        Lorraine Pryor (Inactive) added a comment -
        I have looked on Willerby system and its just showings in progress, I will call Mr fox back to say it just showing in progress.
        As soon as Willerby come back we will call him back.
        Show
        Lorraine Pryor (Inactive) added a comment - I have looked on Willerby system and its just showings in progress, I will call Mr fox back to say it just showing in progress. As soon as Willerby come back we will call him back.
        Claire Folland made changes -
        Attachment screenshot-2.jpg [ 42258 ]
        Claire Folland made changes -
        Status Acknowledged [ 10005 ] Parts ordered [ 3 ]
        Claire Folland made changes -
        Parts in 13/May/13 11:10 AM
        Status Parts ordered [ 3 ] Parts Recieved [ 10003 ]
        Claire Folland made changes -
        Status Parts Recieved [ 10003 ] Worksheet Issued [ 10004 ]
        Hide
        Claire Folland added a comment - - edited
        willerby attending wc 13-5-13, called Mr Fox to advise
        Show
        Claire Folland added a comment - - edited willerby attending wc 13-5-13, called Mr Fox to advise
        Claire Folland made changes -
        Work Scheduled 13/May/13
        Status Worksheet Issued [ 10004 ] Engineer Scheduled [ 10000 ]
        Hide
        Claire Folland added a comment -
        called Natalie at willerby to try and find out what day the engineer will be on site, she tried to call the engineer but the phone lost signal, she thinks it will be towards the end of the week, she has left a message for the engineer to give her a call back
        Show
        Claire Folland added a comment - called Natalie at willerby to try and find out what day the engineer will be on site, she tried to call the engineer but the phone lost signal, she thinks it will be towards the end of the week, she has left a message for the engineer to give her a call back
        Claire Folland made changes -
        Attachment screenshot-3.jpg [ 43221 ]
        Hide
        Claire Folland added a comment -
        complete by willerby 17-5-13
        Show
        Claire Folland added a comment - complete by willerby 17-5-13
        Claire Folland made changes -
        Status Engineer Scheduled [ 10000 ] Resolved [ 5 ]
        Resolution Completed [ 1 ]
        Claire Folland made changes -
        Status Resolved [ 5 ] Complete [ 6 ]
        Mark Lock (Inactive) made changes -
        Workflow Surfbay [ 79133 ] Manufacturers ver 2.0 [ 98995 ]
        Adrienne Barwell (Inactive) made changes -
        Workflow Manufacturers ver 2.0 [ 98995 ] Manufacturers ver 2.1 [ 135215 ]
        Adrienne Barwell (Inactive) made changes -
        Workflow Manufacturers ver 2.1 [ 135215 ] Manufacturers ver 2.2 [ 152436 ]
        Transition Time In Source Status Execution Times Last Executer Last Execution Date
        Open Open Submitted Submitted
        18m 54s 1 Claire Folland 19/Apr/13 12:02 PM
        Submitted Submitted Acknowledged Acknowledged
        1h 48m 1 Claire Folland 19/Apr/13 1:51 PM
        Acknowledged Acknowledged Parts ordered Parts ordered
        10d 20h 19m 1 Claire Folland 30/Apr/13 10:10 AM
        Parts ordered Parts ordered Parts Recieved Parts Recieved
        8s 1 Claire Folland 30/Apr/13 10:10 AM
        Parts Recieved Parts Recieved Worksheet Issued Worksheet Issued
        2s 1 Claire Folland 30/Apr/13 10:10 AM
        Worksheet Issued Worksheet Issued Engineer Scheduled Engineer Scheduled
        17s 1 Claire Folland 30/Apr/13 10:11 AM
        Engineer Scheduled Engineer Scheduled Resolved Resolved
        22d 23h 26m 1 Claire Folland 23/May/13 9:38 AM
        Resolved Resolved Complete Complete
        4s 1 Claire Folland 23/May/13 9:38 AM

          People

          • Watchers:
            0 Start watching this issue

            Dates

            • Due:
              Created:
              Updated:
              Resolved:
              Work Scheduled: