ABI
  1. ABI
  2. ABI-31302

failed it's connection EICR due to an fault on one of the circuits

    Details

    • Type: Electrical Faults (2 Weeks) Electrical Faults (2 Weeks)
    • Status: Complete
    • Priority: Normal Normal
    • Resolution: Completed
    • Labels:
      None
    • Responsibility:
      Manufacturer Attending
    • Plot:
      Hire 7
    • Hire_or_Retail:
      Hire_fleet
    • Serial:
      2151361
    • Model:
      keswick
    • Year:
      2026
    • Size:
      36x12
    • ID Number:
      W0242634
    • Status Colour:
      Complete Complete
    • Stock_Number:
      42915
    • Times Scheduled:
      1
    • Park_Company:
       Golden Cap Caravan Park - WDLH
    • Park_Postcode:
      DT6 6JX
    • Park_Contact:
      Jen
    • Park_Phone:
      01297480010
    • Park_Email:
      caravanholidayhomes1@wdlh.co.uk
    • Park_Code:
      GOLD02
    • Park_Key_Account:
      Yes
    • SLA Status:

      Description

      CCT01 - Ring Main. Circuit has no ring end continuity on the Line conductor. Further investigation required. Neutral and CPC ring end readings are good and inline with what is expected. I suspect this is a loose connection behind one of the accessories. With the correct approach, it should be relativly straightforward to locate.

      The rest of the circuits have been inspected and tested, and there are no other electrical issues to report.

      This has come from our electrician.
      1. 1.png
        90 kB
      2. 1.png
        85 kB
      3. 1.png
        105 kB

        Activity

        Transition Time In Source Status Execution Times Last Executer Last Execution Date
        Open Open Submitted Submitted
        2m 52s 1 Claire Folland 24/Jan/26 10:47 AM
        Submitted Submitted Acknowledged Acknowledged
        5d 59m 1 Claire Folland 29/Jan/26 11:46 AM
        Acknowledged Acknowledged Worksheet Issued Worksheet Issued
        30d 22h 21m 1 Claire Folland 01/Mar/26 10:08 AM
        Worksheet Issued Worksheet Issued Engineer Scheduled Engineer Scheduled
        2s 1 Claire Folland 01/Mar/26 10:08 AM
        Engineer Scheduled Engineer Scheduled Resolved Resolved
        5s 1 Claire Folland 01/Mar/26 10:08 AM
        Resolved Resolved Complete Complete
        2s 1 Claire Folland 01/Mar/26 10:08 AM

          People

          • Assignee:
            Claire Folland
            Reporter:
            Claire Folland
            Participants:
          • Watchers:
            0 Start watching this issue

            Dates

            • Due:
              Created:
              Updated:
              Resolved: