ABI
  1. ABI
  2. ABI-31302

failed it's connection EICR due to an fault on one of the circuits

    Details

    • Type: Electrical Faults (2 Weeks) Electrical Faults (2 Weeks)
    • Status: Complete
    • Priority: Normal Normal
    • Resolution: Completed
    • Labels:
      None
    • Responsibility:
      Manufacturer Attending
    • Plot:
      Hire 7
    • Hire_or_Retail:
      Hire_fleet
    • Serial:
      2151361
    • Model:
      keswick
    • Year:
      2026
    • Size:
      36x12
    • ID Number:
      W0242634
    • Status Colour:
      Complete Complete
    • Stock_Number:
      42915
    • Times Scheduled:
      1
    • Park_Company:
       Golden Cap Caravan Park - WDLH
    • Park_Postcode:
      DT6 6JX
    • Park_Contact:
      Jen
    • Park_Phone:
      01297480010
    • Park_Email:
      caravanholidayhomes1@wdlh.co.uk
    • Park_Code:
      GOLD02
    • Park_Key_Account:
      Yes
    • SLA Status:

      Description

      CCT01 - Ring Main. Circuit has no ring end continuity on the Line conductor. Further investigation required. Neutral and CPC ring end readings are good and inline with what is expected. I suspect this is a loose connection behind one of the accessories. With the correct approach, it should be relativly straightforward to locate.

      The rest of the circuits have been inspected and tested, and there are no other electrical issues to report.

      This has come from our electrician.
      1. 1.png
        105 kB
      2. 1.png
        85 kB
      3. 1.png
        90 kB

        Activity

        01/Mar/26 10:08 AM
        Resolved
        Status Change
        Complete
        2 seconds
        01/Mar/26 10:08 AM
        Engineer Scheduled
        Status Change
        Resolved
        5 seconds
        01/Mar/26 10:08 AM
        Worksheet Issued
        Status Change
        Engineer Scheduled
        2 seconds
        01/Mar/26 10:08 AM
        Acknowledged
        Status Change
        Worksheet Issued
        1 month and 22 hours and 21 minutes and 49 seconds
        29/Jan/26 11:46 AM
        Submitted
        Status Change
        Acknowledged
        5 days and 59 minutes and 8 seconds
        Transition Owner Before Transition Transition After Transition Response Time
        24/Jan/26 10:47 AM
        Status Change
        Submitted
        2 minutes and 52 seconds

          People

          • Assignee:
            Claire Folland
            Reporter:
            Claire Folland
            Participants:
          • Watchers:
            0 Start watching this issue

            Dates

            • Due:
              Created:
              Updated:
              Resolved: