Details

    • Type: Roof (8 Weeks) Roof (8 Weeks)
    • Status: Worksheet Issued
    • Priority: High High
    • Resolution: Unresolved
    • Labels:
      None
    • Plot:
      39
    • Model:
      torronto lodge
    • Serial:
      045457h
    • Size:
      40x20
    • Status Colour:
      Worksheet Issued Worksheet Issued
    • Supplier:
      Swift
    • Ordered By?:
      DT
    • Stock_Number:
      41882
    • Park_Company:
       SJP Transport Ltd
    • Park_Code:
      SJP001
    • Park_Phone:
      01482 893763
    • Park_Postcode:
      HU12 8FB
    • Satisfaction note signed:
      No
    • Park_Key_Account:
      No
    • SLA: Quote Time to:
    • SLA Status:
    • Quote outcome:
      Accepted

      Description

      of area of lodge roof which has either been damaged/collapsed/ installed incorrectly. During the high winds we noticed noises coming from the rear of the lodge and also in kitchen area which caused us to inspect the roof. The dip in the roof at the front non entry of the lodge was then noticed.
      1. QUOT-4056 .pdf
        143 kB
        Duncan Thomson
      2. CCF_002283.pdf
        380 kB
        Claire Folland
      1. Plot 39- Roof 2.jpg
        122 kB
      2. Plot 39- Roof.jpg
        116 kB
      3. Parts Ordered.png
        104 kB
      4. Parts Ordered.png
        78 kB
      5. Capture.JPG
        185 kB
      6. Capture.JPG
        104 kB
      7. Capture.JPG
        169 kB
      8. Capture.JPG
        92 kB

        Activity

        Hide
        Melanie Woolacott added a comment -
        PAID FOR 21/03/2025.
        Show
        Melanie Woolacott added a comment - PAID FOR 21/03/2025.
        Hide
        Claire Folland added a comment -
        complete by steve/Duncan 14-1-25 worksheet attached
        Show
        Claire Folland added a comment - complete by steve/Duncan 14-1-25 worksheet attached
        Hide
        James Eginton added a comment -
        Parts 1724683 foam filler and 172936 tile ridge both received.

        All of the above parts loaded onto Steve's van.
        Show
        James Eginton added a comment - Parts 1724683 foam filler and 172936 tile ridge both received. All of the above parts loaded onto Steve's van.
        Hide
        Claire Folland added a comment -
        issued worksheet as we are attending next week
        Show
        Claire Folland added a comment - issued worksheet as we are attending next week
        Hide
        James Eginton added a comment -
        1722004 and 1722005 cap bargeboard ends left and right received, labelled as above.
        Show
        James Eginton added a comment - 1722004 and 1722005 cap bargeboard ends left and right received, labelled as above.
        Hide
        James Eginton added a comment -
        1721960 Cap bargeboard centre received, labelled as above.
        Show
        James Eginton added a comment - 1721960 Cap bargeboard centre received, labelled as above.
        Hide
        James Eginton added a comment - - edited
        Underlay received, labelled and placed by devon rack for the time being.
        Show
        James Eginton added a comment - - edited Underlay received, labelled and placed by devon rack for the time being.
        Hide
        Duncan Thomson added a comment -
        Have ordered new locks and keys as requested by matt Steele for park to fit, unrelated to this claim but have made a not on this quote for reference as we might need to fit when on park fixing the roof.
        Show
        Duncan Thomson added a comment - Have ordered new locks and keys as requested by matt Steele for park to fit, unrelated to this claim but have made a not on this quote for reference as we might need to fit when on park fixing the roof.

          People

          • Assignee:
            Charleen Sibley
            Reporter:
            Duncan Thomson
          • Watchers:
            0 Start watching this issue

            Dates

            • Due:
              Created:
              Updated: