Details

    • Type: Roof (8 Weeks) Roof (8 Weeks)
    • Status: Worksheet Issued
    • Priority: High High
    • Resolution: Unresolved
    • Labels:
      None
    • Plot:
      39
    • Model:
      torronto lodge
    • Serial:
      045457h
    • Size:
      40x20
    • Status Colour:
      Worksheet Issued Worksheet Issued
    • Supplier:
      Swift
    • Ordered By?:
      DT
    • Stock_Number:
      41882
    • Park_Company:
       SJP Transport Ltd
    • Park_Code:
      SJP001
    • Park_Phone:
      01482 893763
    • Park_Postcode:
      HU12 8FB
    • Satisfaction note signed:
      No
    • Park_Key_Account:
      No
    • SLA: Quote Time to:
    • SLA Status:
    • Quote outcome:
      Accepted

      Description

      of area of lodge roof which has either been damaged/collapsed/ installed incorrectly. During the high winds we noticed noises coming from the rear of the lodge and also in kitchen area which caused us to inspect the roof. The dip in the roof at the front non entry of the lodge was then noticed.
      1. CCF_002283.pdf
        380 kB
        Claire Folland
      2. QUOT-4056 .pdf
        143 kB
        Duncan Thomson
      1. Capture.JPG
        92 kB
      2. Capture.JPG
        185 kB
      3. Capture.JPG
        104 kB
      4. Capture.JPG
        169 kB
      5. Parts Ordered.png
        78 kB
      6. Parts Ordered.png
        104 kB
      7. Plot 39- Roof.jpg
        116 kB
      8. Plot 39- Roof 2.jpg
        122 kB

        Activity

        Duncan Thomson created issue -
        Duncan Thomson made changes -
        Field Original Value New Value
        Project Swift [ 10018 ] Quotes [ 10020 ]
        Key SWIFT-34611 QUOT-4056
        Issue Type Toilet/Shower (8 Weeks) [ 41 ] Roof (8 Weeks) [ 40 ]
        Workflow Manufacturers ver 2.2 [ 259317 ] Quotes ver 3.1 [ 259318 ]
        Responsibility Manufacturer Attending [ 10045 ]
        Quote outcome None [ 12253 ]
        Times Scheduled 0
        Hire_or_Retail Retail [ 10251 ]
        Duncan Thomson made changes -
        ID Number SBH015867
        Duncan Thomson made changes -
        Priority Normal [ 21 ] High [ 23 ]
        Duncan Thomson made changes -
        Status Open [ 1 ] Assessment Sheet Issued [ 10549 ]
        Assignee Duncan Thomson [ duncan ] Charleen Sibley [ charleen sibley ]
        Duncan Thomson made changes -
        Summary Sitting Issues to be sorted by Surf Bay Siting Issues to be sorted by Surf Bay
        Duncan Thomson made changes -
        Attachment Parts Ordered.png [ 392847 ]
        Duncan Thomson made changes -
        Status Assessment Sheet Issued [ 10549 ] Engineer Assessment Scheduled [ 10048 ]
        Assignee Charleen Sibley [ charleen sibley ] Duncan Thomson [ duncan ]
        Plot
        Duncan Thomson made changes -
        Status Engineer Assessment Scheduled [ 10048 ] Awaiting Quote [ 10006 ]
        Supplier Swift [ 10353 ]
        Ordered By? DT
        Duncan Thomson made changes -
        Status Awaiting Quote [ 10006 ] Quotation supplied [ 10007 ]
        Manufacturer Swift
        Duncan Thomson made changes -
        Attachment Parts Ordered.png [ 393305 ]
        Hide
        Duncan Thomson added a comment -
        Have ordered new locks and keys as requested by matt Steele for park to fit, unrelated to this claim but have made a not on this quote for reference as we might need to fit when on park fixing the roof.
        Show
        Duncan Thomson added a comment - Have ordered new locks and keys as requested by matt Steele for park to fit, unrelated to this claim but have made a not on this quote for reference as we might need to fit when on park fixing the roof.
        Hide
        James Eginton added a comment - - edited
        Underlay received, labelled and placed by devon rack for the time being.
        Show
        James Eginton added a comment - - edited Underlay received, labelled and placed by devon rack for the time being.
        Hide
        James Eginton added a comment -
        1721960 Cap bargeboard centre received, labelled as above.
        Show
        James Eginton added a comment - 1721960 Cap bargeboard centre received, labelled as above.
        Hide
        James Eginton added a comment -
        1722004 and 1722005 cap bargeboard ends left and right received, labelled as above.
        Show
        James Eginton added a comment - 1722004 and 1722005 cap bargeboard ends left and right received, labelled as above.
        Claire Folland made changes -
        Attachment Capture.JPG [ 394368 ]
        Hide
        Claire Folland added a comment -
        issued worksheet as we are attending next week
        Show
        Claire Folland added a comment - issued worksheet as we are attending next week
        Hide
        James Eginton added a comment -
        Parts 1724683 foam filler and 172936 tile ridge both received.

        All of the above parts loaded onto Steve's van.
        Show
        James Eginton added a comment - Parts 1724683 foam filler and 172936 tile ridge both received. All of the above parts loaded onto Steve's van.
        Claire Folland made changes -
        Attachment CCF_002283.pdf [ 394900 ]
        Hide
        Claire Folland added a comment -
        complete by steve/Duncan 14-1-25 worksheet attached
        Show
        Claire Folland added a comment - complete by steve/Duncan 14-1-25 worksheet attached
        Duncan Thomson made changes -
        Status Quotation supplied [ 10007 ] Waiting for Customer [ 10350 ]
        Duncan Thomson made changes -
        Park_Company Llanrhidian Holiday Park SJP Transport Ltd
        Duncan Thomson made changes -
        Park_Postcode SA3 1EU HU12 8FB
        Park_Email Linda MacNamara | Llanrhidian Holiday Park <llanrhidian-sales2@johnfowler.co.uk> enquiries@sjptransport.co.uk
        Park_Phone 01792 966998 01482 893763
        Park_Code LLAN01 SJP001
        Park_Address2 Gower Unit 8, Century Yard, Hedon Road
        Park_City WALES Hull
        Park_Address Llanrhidian SJP Transport Ltd
        Duncan Thomson made changes -
        Attachment QUOT-4056 .pdf [ 395104 ]
        Duncan Thomson made changes -
        Status Waiting for Customer [ 10350 ] Quotation accepted [ 10008 ]
        Quote outcome None [ 12253 ] Accepted [ 12254 ]
        Duncan Thomson made changes -
        Status Quotation accepted [ 10008 ] Parts ordered [ 3 ]
        Duncan Thomson made changes -
        Status Parts ordered [ 3 ] Parts Recieved [ 10003 ]
        Assignee Duncan Thomson [ duncan ] Claire Folland [ claire ]
        Plot
        Duncan Thomson made changes -
        Status Parts Recieved [ 10003 ] Parts in Stock [ 10031 ]
        Assignee Claire Folland [ claire ] Duncan Thomson [ duncan ]
        Duncan Thomson made changes -
        Status Parts in Stock [ 10031 ] Worksheet Issued [ 10004 ]
        Assignee Duncan Thomson [ duncan ] Charleen Sibley [ charleen sibley ]
        Hide
        Melanie Woolacott added a comment -
        PAID FOR 21/03/2025.
        Show
        Melanie Woolacott added a comment - PAID FOR 21/03/2025.
        Transition Time In Source Status Execution Times Last Executer Last Execution Date
        Open Open Assessment Sheet Issued Assessment Sheet Issued
        3m 5s 1 Duncan Thomson 29/Nov/24 2:07 PM
        Assessment Sheet Issued Assessment Sheet Issued Engineer Assessment Scheduled Engineer Assessment Scheduled
        5m 3s 1 Duncan Thomson 29/Nov/24 2:12 PM
        Engineer Assessment Scheduled Engineer Assessment Scheduled Awaiting Quote Awaiting Quote
        17s 1 Duncan Thomson 29/Nov/24 2:12 PM
        Awaiting Quote Awaiting Quote Quotation supplied Quotation supplied
        9s 1 Duncan Thomson 29/Nov/24 2:13 PM
        Quotation supplied Quotation supplied Waiting for Customer Waiting for Customer
        55d 21h 50m 1 Duncan Thomson 24/Jan/25 12:03 PM
        Waiting for Customer Waiting for Customer Quotation accepted Quotation accepted
        47m 57s 1 Duncan Thomson 24/Jan/25 12:51 PM
        Quotation accepted Quotation accepted Parts ordered Parts ordered
        3s 1 Duncan Thomson 24/Jan/25 12:51 PM
        Parts ordered Parts ordered Parts Recieved Parts Recieved
        4s 1 Duncan Thomson 24/Jan/25 12:51 PM
        Parts Recieved Parts Recieved Parts in Stock Parts in Stock
        1s 1 Duncan Thomson 24/Jan/25 12:51 PM
        Parts in Stock Parts in Stock Worksheet Issued Worksheet Issued
        7s 1 Duncan Thomson 24/Jan/25 12:51 PM

          People

          • Assignee:
            Charleen Sibley
            Reporter:
            Duncan Thomson
          • Watchers:
            0 Start watching this issue

            Dates

            • Due:
              Created:
              Updated: