Swift
  1. Swift
  2. SWIFT-2322

The ceiling above the triangular window is marked

    Details

    • Type: Small Fittings (8 Weeks) Small Fittings (8 Weeks)
    • Status: Complete
    • Priority: Critical Critical
    • Resolution: Completed
    • Labels:
      None
    • Customer Code:
      WILKS01
    • Park:
      WILKSWORTH
    • Postcode:
      BH21 4HW
    • Responsibility:
      Manufacturer Attending
    • Plot:
      39
    • Serial:
      8221h
    • Model:
      CHAMONIX
    • Size:
      39 X 12
    • ID Number:
      SBH001989
    • Status Colour:
      Complete Complete
    • Park_Company:
       Not defined
    • SLA Status:

      Description

      THE CEILING ABOVE THE TRIANGULAR WINDOW IS MARKED - WE SENT STEVE OUT TO CLEAN HOWEVER THE CUSTOMER IS NOT HAPPY WITH THE REPAIR.
      1. CCF19042011_00000.jpg
        919 kB
      2. IMG_0187(1).JPG
        713 kB
      3. IMG_0188(1).JPG
        893 kB
      4. screenshot-1.jpg
        286 kB

        Activity

        Hide
        Linda Trunkfield (Inactive) added a comment -
        STEVE ATTENDED TO THIS BUT THE CUSTOMER IS NOT SATISFIED
        Show
        Linda Trunkfield (Inactive) added a comment - STEVE ATTENDED TO THIS BUT THE CUSTOMER IS NOT SATISFIED
        Hide
        Adrienne Barwell (Inactive) added a comment -
        Swift did not have the correct part with them to carry out the repair.
        Show
        Adrienne Barwell (Inactive) added a comment - Swift did not have the correct part with them to carry out the repair.
        Hide
        Adrienne Barwell (Inactive) added a comment -
        this issue was on the critical list sent to Julie Clark today
        Show
        Adrienne Barwell (Inactive) added a comment - this issue was on the critical list sent to Julie Clark today
        Hide
        Adrienne Barwell (Inactive) added a comment -
        Swift advise parts are on order - no date yet
        Show
        Adrienne Barwell (Inactive) added a comment - Swift advise parts are on order - no date yet
        Hide
        Adrienne Barwell (Inactive) added a comment -
        this issue is on the critical list sent to Sarah Neal today
        Show
        Adrienne Barwell (Inactive) added a comment - this issue is on the critical list sent to Sarah Neal today
        Hide
        Adrienne Barwell (Inactive) added a comment -
        this is on the critical list sent to Julie Clark today
        Show
        Adrienne Barwell (Inactive) added a comment - this is on the critical list sent to Julie Clark today
        Hide
        Adrienne Barwell (Inactive) added a comment -
        Engineer due wc 05.09.2011
        Show
        Adrienne Barwell (Inactive) added a comment - Engineer due wc 05.09.2011
        Hide
        Adrienne Barwell (Inactive) added a comment -
        Chased this via the swift critical list awaiting response
        Show
        Adrienne Barwell (Inactive) added a comment - Chased this via the swift critical list awaiting response
        Hide
        Adrienne Barwell (Inactive) added a comment -
        Rang Sarah and asked her to check whether this has been completed by Swift - Sarah confirmed that this is complete
        Show
        Adrienne Barwell (Inactive) added a comment - Rang Sarah and asked her to check whether this has been completed by Swift - Sarah confirmed that this is complete

          People

          • Watchers:
            0 Start watching this issue

            Dates

            • Due:
              Created:
              Updated:
              Resolved:
              Work Scheduled: