Swift
  1. Swift
  2. SWIFT-7335

Rejected unit, due to water ingress around the apex

    Details

    • Type: Ext Doors & Windows (4 weeks) Ext Doors & Windows (4 weeks)
    • Status: Complete
    • Priority: Manager escalations Manager escalations
    • Resolution: Completed
    • Labels:
      None
    • Customer Code:
      lad01
    • Park:
      Ladram Bay
    • Postcode:
      EX9 7BX
    • Responsibility:
      Manufacturer Attending
    • Plot:
      PV26
    • Hire_or_Retail:
      Retail
    • Serial:
      10930h
    • Model:
      Champagne
    • Size:
      41 x 12
    • ID Number:
      SBH004064
    • Status Colour:
      Complete Complete
    • Stock_Number:
      28156
    • Times Scheduled:
      1
    • Park_Company:
       Ladram Bay Holiday Centre
    • Park_Postcode:
      EX9 7BX
    • Park_Phone:
      01395 568761
    • Park_Email:
      info@ladrambay.co.uk
    • Park_Code:
      LADR01
    • Park_Key_Account:
      Yes
    • SLA Status:
    1. screenshot-1.jpg
      214 kB
    2. screenshot-2.jpg
      241 kB
    3. screenshot-3.jpg
      220 kB
    4. screenshot-4.jpg
      196 kB
    5. screenshot-5.jpg
      195 kB

      Issue Links

        Activity

        Hide
        Adrienne Barwell (Inactive) added a comment -
        Darren has advised that there is nothing further he requires from me with regard to this unit
        Show
        Adrienne Barwell (Inactive) added a comment - Darren has advised that there is nothing further he requires from me with regard to this unit
        Hide
        Adrienne Barwell (Inactive) added a comment -
        New Champagne has now been delivered
        Show
        Adrienne Barwell (Inactive) added a comment - New Champagne has now been delivered
        Hide
        Adrienne Barwell (Inactive) added a comment -
        Darren has advised that the new unit is now in place on site, I will arrange for an engineer to visit and inspect on Friday
        Show
        Adrienne Barwell (Inactive) added a comment - Darren has advised that the new unit is now in place on site, I will arrange for an engineer to visit and inspect on Friday
        Hide
        Adrienne Barwell (Inactive) added a comment - - edited
        Darren has advised that the new unit is due for delivery next week and he has arranged for the collection of the old unit
        Show
        Adrienne Barwell (Inactive) added a comment - - edited Darren has advised that the new unit is due for delivery next week and he has arranged for the collection of the old unit
        Hide
        Adrienne Barwell (Inactive) added a comment -
        I have checked with Darren and there is nothing further he requires from me at present, the new unit should come off production around 19th January and we should then be able to take the original one of Ladram and the new one put in place
        Show
        Adrienne Barwell (Inactive) added a comment - I have checked with Darren and there is nothing further he requires from me at present, the new unit should come off production around 19th January and we should then be able to take the original one of Ladram and the new one put in place

          People

          • Assignee:
            Adrienne Barwell (Inactive)
            Reporter:
            Adrienne Barwell (Inactive)
            Participants:
          • Watchers:
            1 Start watching this issue

            Dates

            • Due:
              Created:
              Updated:
              Resolved:
              Work Scheduled: