Details

    • Type: Exterior Panels (8 Weeks) Exterior Panels (8 Weeks)
    • Status: Assessment Sheet Issued
    • Priority: Over 8 Weeks Over 8 Weeks
    • Resolution: Unresolved
    • Labels:
      None
    • ID Number:
      096888
    • Order No:
      AS9055/5041
    • Plot:
      unknown
    • Model:
      Oakley
    • Serial:
      1730416
    • Size:
      36x10
    • Status Colour:
      Assessment Sheet Issued Assessment Sheet Issued
    • Supplier:
      ABI
    • Ordered By?:
      Adrienne
    • Stock_Number:
      30571
    • Park_Company:
       Polzeath Beach Holiday Park
    • Park_Code:
      POLZ01
    • Park_Contact:
      Louise and Michael Wonnacott
    • Park_Phone:
      01208863320
    • Park_Postcode:
      PL27 6ST
    • Invoice Number:
      ..
    • Satisfaction note signed:
      No
    • Park_Key_Account:
      Yes
    • SLA: Quote Time to:
    • SLA Status:
    • Quote outcome:
      None
    1. QUOT-1485.docx
      15 kB
      Adrienne Barwell
    1. screenshot-9.jpg
      193 kB
    2. screenshot-8.jpg
      150 kB
    3. screenshot-7.jpg
      147 kB
    4. screenshot-6.jpg
      163 kB
    5. screenshot-5.jpg
      147 kB
    6. screenshot-4.jpg
      190 kB
    7. screenshot-3.jpg
      150 kB
    8. screenshot-2.jpg
      199 kB
    9. screenshot-1.jpg
      175 kB

      Activity

      Hide
      Adrienne Barwell (Inactive) added a comment -
      Dan has advised that the panel is at the factory and asked for a van that he can put it in. I have advised that it can go in stock 30732 which is the last Polzeath van at the factory. I am waiting for confirmation that this has been done
      Show
      Adrienne Barwell (Inactive) added a comment - Dan has advised that the panel is at the factory and asked for a van that he can put it in. I have advised that it can go in stock 30732 which is the last Polzeath van at the factory. I am waiting for confirmation that this has been done
      Hide
      Adrienne Barwell (Inactive) added a comment -
      Daniel has advised that it would be easier for them to deliver it to Surf Bay next week (no cost) I have said this is fine because we are fitting the panel
      Show
      Adrienne Barwell (Inactive) added a comment - Daniel has advised that it would be easier for them to deliver it to Surf Bay next week (no cost) I have said this is fine because we are fitting the panel
      Hide
      Claire Folland added a comment -
      ABI engineer has delivered panel and corner capping, issued worksheet
      Show
      Claire Folland added a comment - ABI engineer has delivered panel and corner capping, issued worksheet
      Hide
      Adrienne Barwell (Inactive) added a comment -
      I have phoned Michael to arrange to fit the panel he has advised that he cancelled the order, I queried this and then he said that actually he hadn't sent the paperwork back. I advised that he had verbally asked me to order the panel so I had.

      Michael then said he would pay for the panel if he had to however, he had damaged a back bottom panel on a VISTA and wondered if it could be used to repair that unit. The Vista is on pitch B2

      I will speak to Steve and see what he thinks
      Show
      Adrienne Barwell (Inactive) added a comment - I have phoned Michael to arrange to fit the panel he has advised that he cancelled the order, I queried this and then he said that actually he hadn't sent the paperwork back. I advised that he had verbally asked me to order the panel so I had. Michael then said he would pay for the panel if he had to however, he had damaged a back bottom panel on a VISTA and wondered if it could be used to repair that unit. The Vista is on pitch B2 I will speak to Steve and see what he thinks
      Hide
      Adrienne Barwell (Inactive) added a comment -
      The site have advised that they have covered up the damage and do not want the panel, Steve has said it is not suitable for the other damage on the site. So we will have to put this panel into stock
      Show
      Adrienne Barwell (Inactive) added a comment - The site have advised that they have covered up the damage and do not want the panel, Steve has said it is not suitable for the other damage on the site. So we will have to put this panel into stock

        People

        • Assignee:
          Charleen Sibley
          Reporter:
          Adrienne Barwell (Inactive)
        • Watchers:
          0 Start watching this issue

          Dates

          • Due:
            Created:
            Updated:
            Parts in:
            Parts Expected: