Details

    • Type: Small Fittings (8 Weeks) Small Fittings (8 Weeks)
    • Status: Complete
    • Priority: Critical Critical
    • Resolution: Completed
    • Labels:
      None
    • Customer Code:
      harf01
    • Park:
      Harford Bridge
    • Postcode:
      PL19 9LS
    • Responsibility:
      SurfBay Attending
    • Serial:
      9925H
    • Model:
      Bordeaux
    • Size:
      35 X 12
    • ID Number:
      sbh002359
    • Status Colour:
      Complete Complete
    • Order No:
      SBH002010
    • Park_Company:
       Not defined
    • SLA Status:
    1. SKMBT_C25312022711410.pdf
      1.08 MB
      Adrienne Barwell
    2. swift-3222.doc
      47 kB
      Adrienne Barwell
    3. SKMBT_C25312032813390.pdf
      431 kB
      Lorraine Pryor
    1. screenshot-1.jpg
      189 kB
    2. screenshot-2.jpg
      146 kB
    3. screenshot-3.jpg
      162 kB

      Issue Links

        Activity

        Hide
        Lorraine Pryor (Inactive) added a comment -
        checked swift and carpet trim is awaiting despatch due 20/03/12
        Show
        Lorraine Pryor (Inactive) added a comment - checked swift and carpet trim is awaiting despatch due 20/03/12
        Hide
        Lorraine Pryor (Inactive) added a comment -
        part received
        swift d/n 27945
        Show
        Lorraine Pryor (Inactive) added a comment - part received swift d/n 27945
        Hide
        Adrienne Barwell (Inactive) added a comment -
        Keith advises that the back joining strip snapped off the new one, so he had to refit the old one - Keith needs a replacement and also says he needs a hot air gun to fit. Paperwork passed back to Linda
        Show
        Adrienne Barwell (Inactive) added a comment - Keith advises that the back joining strip snapped off the new one, so he had to refit the old one - Keith needs a replacement and also says he needs a hot air gun to fit. Paperwork passed back to Linda

          People

          • Watchers:
            0 Start watching this issue

            Dates

            • Due:
              Created:
              Updated:
              Resolved:
              Work Scheduled:
              Parts Expected: