The site have advised that swift are replacing the front windows, however, the triangle top window section on the front has moved and gaps have appeared, that the wind and water is now coming through

    Details

    • Type: Ext Doors & Windows (4 weeks) Ext Doors & Windows (4 weeks)
    • Status: Complete
    • Priority: Critical Critical
    • Resolution: Completed
    • Labels:
      None
    • Customer Code:
      lad01
    • Park:
      Ladram Bay
    • Postcode:
      EX9 7BX
    • Responsibility:
      Manufacturer Attending
    • Plot:
      PV26
    • Serial:
      10930h
    • Model:
      Champagne
    • Size:
      41 x 12
    • Status Colour:
      Complete Complete
    • Park_Company:
       Not defined
    • SLA Status:

      Description

      We have received an e-mail from Gary Rix advising that Swift are going to replace the whole front window, (there was nothing on Jira) but in the meantime the triangle top window section on the front has moved and gaps have appeared that the wind and water is now coming through - please see photo’s attached.

       I have spoken to Samantha at swift who said that they want to go down next week w/c 11-03-12 but this still needs to be confirmed - she asked if anyone could go and try to make the area water tight - Steve is on site doing PDI'S today so I have asked him to go and see if there is anything that he can do.
      1. screenshot-5.jpg
        170 kB
      2. screenshot-4.jpg
        163 kB
      3. screenshot-3.jpg
        143 kB
      4. screenshot-2.jpg
        160 kB
      5. screenshot-1.jpg
        148 kB
      6. IMG_1069.JPG
        3.01 MB
      7. IMG_1068.JPG
        2.74 MB
      8. IMG_1067.JPG
        2.71 MB
      9. IMG_1066.JPG
        2.15 MB
      10. IMG_1065.JPG
        2.36 MB

        Issue Links

          Activity

          Transition Owner Before Transition Transition After Transition Response Time
          04/Mar/13 1:06 PM
          Status Change
          17 minutes and 8 seconds
          07/Mar/13 2:53 PM
          Status Change
          Acknowledged
          3 days and 1 hour and 46 minutes and 59 seconds
          07/Mar/13 2:54 PM
          Acknowledged
          Status Change
          Parts ordered
          12 seconds
          07/Mar/13 2:54 PM
          Parts ordered
          Status Change
          Parts Recieved
          10 seconds
          07/Mar/13 2:54 PM
          Parts Recieved
          Status Change
          Worksheet Issued
          3 seconds
          07/Mar/13 2:54 PM
          Worksheet Issued
          Status Change
          Engineer Scheduled
          7 seconds
          20/Mar/13 2:54 PM
          Engineer Scheduled
          Status Change
          1 week and 6 days
          20/Mar/13 2:54 PM
          Status Change
          4 seconds
          25/Mar/13 3:58 PM
          Status Change
          5 days and 1 hour and 4 minutes and 13 seconds
          25/Mar/13 3:59 PM
          Status Change
          21 seconds