Swift
  1. Swift
  2. SWIFT-5017

The site have advised that swift are replacing the front windows, however, the triangle top window section on the front has moved and gaps have appeared, that the wind and water is now coming through

    Details

    • Type: Ext Doors & Windows (4 weeks) Ext Doors & Windows (4 weeks)
    • Status: Complete
    • Priority: Critical Critical
    • Resolution: Completed
    • Labels:
      None
    • Customer Code:
      lad01
    • Park:
      Ladram Bay
    • Postcode:
      EX9 7BX
    • Responsibility:
      Manufacturer Attending
    • Plot:
      PV26
    • Serial:
      10930h
    • Model:
      Champagne
    • Size:
      41 x 12
    • Status Colour:
      Complete Complete
    • Park_Company:
       Not defined
    • SLA Status:

      Description

      We have received an e-mail from Gary Rix advising that Swift are going to replace the whole front window, (there was nothing on Jira) but in the meantime the triangle top window section on the front has moved and gaps have appeared that the wind and water is now coming through - please see photo’s attached.

       I have spoken to Samantha at swift who said that they want to go down next week w/c 11-03-12 but this still needs to be confirmed - she asked if anyone could go and try to make the area water tight - Steve is on site doing PDI'S today so I have asked him to go and see if there is anything that he can do.
      1. IMG_1065.JPG
        2.36 MB
      2. IMG_1066.JPG
        2.15 MB
      3. IMG_1067.JPG
        2.71 MB
      4. IMG_1068.JPG
        2.74 MB
      5. IMG_1069.JPG
        3.01 MB
      6. screenshot-1.jpg
        148 kB
      7. screenshot-2.jpg
        160 kB
      8. screenshot-3.jpg
        143 kB
      9. screenshot-4.jpg
        163 kB
      10. screenshot-5.jpg
        170 kB

        Issue Links

          Activity

          Linda Trunkfield (Inactive) created issue -
          Linda Trunkfield (Inactive) made changes -
          Field Original Value New Value
          ID Number sbh002666
          Category SurfBay Attending [ 10042 ] Manufacturer Attending [ 10045 ]
          Priority Normal [ 21 ] Critical [ 24 ]
          Summary The site have advised that swift are replacing the front windows, however, the triangle top window section on the front has moved and gaps have appeared, that the wind and water is now coming through - The site have advised that swift are replacing the front windows, however, the triangle top window section on the front has moved and gaps have appeared, that the wind and water is now coming through
          Issue Type Gutters/Downpipes/Corner Cappings (8 Weeks) [ 25 ] Ext Doors & Windows (4 weeks) [ 4 ]
          Description Keith says it was too windy to try to adjust the door We have received an e-mail from Gary Rix advising that Swift are going to replace the whole front window, (there was nothing on Jira) but in the meantime the triangle top window section on the front has moved and gaps have appeared that the wind and water is now coming through - please see photo’s attached.

           I have spoken to Samantha at swift who said that they want to go down next week w/c 11-03-12 but this still needs to be confirmed - she asked if anyone could go and try to make the area water tight - Steve is on site doing PDI'S today so I have asked him to go and see if there is anything that he can do.
          Due Date 06/Aug/12 01/Apr/13
          Linda Trunkfield (Inactive) made changes -
          Attachment IMG_1065.JPG [ 39342 ]
          Attachment IMG_1067.JPG [ 39344 ]
          Attachment IMG_1066.JPG [ 39343 ]
          Linda Trunkfield (Inactive) made changes -
          Attachment IMG_1068.JPG [ 39345 ]
          Linda Trunkfield (Inactive) made changes -
          Status Open [ 1 ] Submitted [ 10001 ]
          Linda Trunkfield (Inactive) made changes -
          Attachment IMG_1069.JPG [ 39348 ]
          Linda Trunkfield (Inactive) made changes -
          Attachment screenshot-1.jpg [ 39349 ]
          Hide
          Linda Trunkfield (Inactive) added a comment -
          I have been trying all morning to forward the photo's to swift with no success, I will try again tomorrow.
          Show
          Linda Trunkfield (Inactive) added a comment - I have been trying all morning to forward the photo's to swift with no success, I will try again tomorrow.
          Linda Trunkfield (Inactive) made changes -
          Attachment screenshot-2.jpg [ 39353 ]
          Hide
          Linda Trunkfield (Inactive) added a comment -
          Laura advised that it is just the front triangle window that is being replaced not the whole of the front - Laura is still trying to get confirmation that they are going w/c 11-03-13.
          Show
          Linda Trunkfield (Inactive) added a comment - Laura advised that it is just the front triangle window that is being replaced not the whole of the front - Laura is still trying to get confirmation that they are going w/c 11-03-13.
          Hide
          Lorraine Pryor (Inactive) added a comment -
          Swift have sent an e-mail today to say that they have made a provisonal booking for an engineer to attend w/c 11th march.
          Looking at the description box , linda has put some notes on say steve was doing PDI etc, so she has been dealing with this one.
          I will advise linda that I have just received this e-mail.
          Show
          Lorraine Pryor (Inactive) added a comment - Swift have sent an e-mail today to say that they have made a provisonal booking for an engineer to attend w/c 11th march. Looking at the description box , linda has put some notes on say steve was doing PDI etc, so she has been dealing with this one. I will advise linda that I have just received this e-mail.
          Lorraine Pryor (Inactive) made changes -
          Attachment screenshot-3.jpg [ 39555 ]
          Hide
          Linda Trunkfield (Inactive) added a comment -
          I spoke to Laura and this has now been confirmed they are attending W/C 11-03-13, I will send an e-mail to the park and let them know.
          Show
          Linda Trunkfield (Inactive) added a comment - I spoke to Laura and this has now been confirmed they are attending W/C 11-03-13, I will send an e-mail to the park and let them know.
          Linda Trunkfield (Inactive) made changes -
          Status Submitted [ 10001 ] Acknowledged [ 10005 ]
          Linda Trunkfield (Inactive) made changes -
          Status Acknowledged [ 10005 ] Parts ordered [ 3 ]
          Linda Trunkfield (Inactive) made changes -
          Status Parts ordered [ 3 ] Parts Recieved [ 10003 ]
          Linda Trunkfield (Inactive) made changes -
          Status Parts Recieved [ 10003 ] Worksheet Issued [ 10004 ]
          Linda Trunkfield (Inactive) made changes -
          Work Scheduled 11/Mar/13
          Status Worksheet Issued [ 10004 ] Engineer Scheduled [ 10000 ]
          Hide
          Lorraine Pryor (Inactive) added a comment -
          Swift have sent an e-mail today to say they are attending w/c 11.03.13, looking at notes linda has already advised the park
          Show
          Lorraine Pryor (Inactive) added a comment - Swift have sent an e-mail today to say they are attending w/c 11.03.13, looking at notes linda has already advised the park
          Lorraine Pryor (Inactive) made changes -
          Attachment screenshot-4.jpg [ 39671 ]
          Hide
          Linda Trunkfield (Inactive) added a comment -
          Darren asked me to call Laura and find out if there is anything outstanding on this van, he also said that the window manufacturers went down with the wrong window, I spoke to Laura and she is not aware of this she said that the window was replaced with the new style champagne window and the engineer is there today fitting extra packers - Laura confirmed that all the other issues on this van are completed and that compensation of one month site fee's. I have e-mailed Darren with this information.
          Show
          Linda Trunkfield (Inactive) added a comment - Darren asked me to call Laura and find out if there is anything outstanding on this van, he also said that the window manufacturers went down with the wrong window, I spoke to Laura and she is not aware of this she said that the window was replaced with the new style champagne window and the engineer is there today fitting extra packers - Laura confirmed that all the other issues on this van are completed and that compensation of one month site fee's. I have e-mailed Darren with this information.
          Adrienne Barwell (Inactive) made changes -
          Resolution Completed [ 1 ]
          Status Engineer Scheduled [ 10000 ] Resolved [ 5 ]
          Adrienne Barwell (Inactive) made changes -
          Status Resolved [ 5 ] Complete [ 6 ]
          Lorraine Pryor (Inactive) made changes -
          Resolution Completed [ 1 ]
          Status Complete [ 6 ] Reopened [ 4 ]
          Lorraine Pryor (Inactive) made changes -
          Attachment screenshot-5.jpg [ 40401 ]
          Lorraine Pryor (Inactive) made changes -
          Status Reopened [ 4 ] Complete [ 6 ]
          Resolution Completed [ 1 ]
          Lorraine Pryor (Inactive) made changes -
          Link This issue Same Van SWIFT-5915 [ SWIFT-5915 ]
          Mark Lock (Inactive) made changes -
          Workflow Surfbay [ 78128 ] Manufacturers ver 2.0 [ 92101 ]
          Adrienne Barwell (Inactive) made changes -
          Link This issue Same Van SWIFT-6151 [ SWIFT-6151 ]
          Adrienne Barwell (Inactive) made changes -
          Workflow Manufacturers ver 2.0 [ 92101 ] Manufacturers ver 2.1 [ 127135 ]
          Adrienne Barwell (Inactive) made changes -
          Workflow Manufacturers ver 2.1 [ 127135 ] Manufacturers ver 2.2 [ 143128 ]
          Transition Time In Source Status Execution Times Last Executer Last Execution Date
          Open Open Submitted Submitted
          17m 8s 1 Linda Trunkfield (Inactive) 04/Mar/13 1:06 PM
          Submitted Submitted Acknowledged Acknowledged
          3d 1h 46m 1 Linda Trunkfield (Inactive) 07/Mar/13 2:53 PM
          Acknowledged Acknowledged Parts ordered Parts ordered
          12s 1 Linda Trunkfield (Inactive) 07/Mar/13 2:54 PM
          Parts ordered Parts ordered Parts Recieved Parts Recieved
          10s 1 Linda Trunkfield (Inactive) 07/Mar/13 2:54 PM
          Parts Recieved Parts Recieved Worksheet Issued Worksheet Issued
          3s 1 Linda Trunkfield (Inactive) 07/Mar/13 2:54 PM
          Worksheet Issued Worksheet Issued Engineer Scheduled Engineer Scheduled
          7s 1 Linda Trunkfield (Inactive) 07/Mar/13 2:54 PM
          Engineer Scheduled Engineer Scheduled Resolved Resolved
          13d 1 Adrienne Barwell (Inactive) 20/Mar/13 2:54 PM
          Resolved Resolved Complete Complete
          4s 1 Adrienne Barwell (Inactive) 20/Mar/13 2:54 PM
          Complete Complete Reopened Reopened
          5d 1h 4m 1 Lorraine Pryor (Inactive) 25/Mar/13 3:58 PM
          Reopened Reopened Complete Complete
          21s 1 Lorraine Pryor (Inactive) 25/Mar/13 3:59 PM

            People

            • Watchers:
              0 Start watching this issue

              Dates

              • Due:
                Created:
                Updated:
                Resolved:
                Work Scheduled: