Swift
  1. Swift
  2. SWIFT-5017

The site have advised that swift are replacing the front windows, however, the triangle top window section on the front has moved and gaps have appeared, that the wind and water is now coming through

    Details

    • Type: Ext Doors & Windows (4 weeks) Ext Doors & Windows (4 weeks)
    • Status: Complete
    • Priority: Critical Critical
    • Resolution: Completed
    • Labels:
      None
    • Customer Code:
      lad01
    • Park:
      Ladram Bay
    • Postcode:
      EX9 7BX
    • Responsibility:
      Manufacturer Attending
    • Plot:
      PV26
    • Serial:
      10930h
    • Model:
      Champagne
    • Size:
      41 x 12
    • Status Colour:
      Complete Complete
    • Park_Company:
       Not defined
    • SLA Status:

      Description

      We have received an e-mail from Gary Rix advising that Swift are going to replace the whole front window, (there was nothing on Jira) but in the meantime the triangle top window section on the front has moved and gaps have appeared that the wind and water is now coming through - please see photo’s attached.

       I have spoken to Samantha at swift who said that they want to go down next week w/c 11-03-12 but this still needs to be confirmed - she asked if anyone could go and try to make the area water tight - Steve is on site doing PDI'S today so I have asked him to go and see if there is anything that he can do.
      1. IMG_1065.JPG
        2.36 MB
      2. IMG_1066.JPG
        2.15 MB
      3. IMG_1067.JPG
        2.71 MB
      4. IMG_1068.JPG
        2.74 MB
      5. IMG_1069.JPG
        3.01 MB
      6. screenshot-1.jpg
        148 kB
      7. screenshot-2.jpg
        160 kB
      8. screenshot-3.jpg
        143 kB
      9. screenshot-4.jpg
        163 kB
      10. screenshot-5.jpg
        170 kB

        Issue Links

          Activity

          Linda Trunkfield (Inactive) created issue -
          Linda Trunkfield (Inactive) made changes -
          Field Original Value New Value
          ID Number sbh002666
          Category SurfBay Attending [ 10042 ] Manufacturer Attending [ 10045 ]
          Priority Normal [ 21 ] Critical [ 24 ]
          Summary The site have advised that swift are replacing the front windows, however, the triangle top window section on the front has moved and gaps have appeared, that the wind and water is now coming through - The site have advised that swift are replacing the front windows, however, the triangle top window section on the front has moved and gaps have appeared, that the wind and water is now coming through
          Issue Type Gutters/Downpipes/Corner Cappings (8 Weeks) [ 25 ] Ext Doors & Windows (4 weeks) [ 4 ]
          Description Keith says it was too windy to try to adjust the door We have received an e-mail from Gary Rix advising that Swift are going to replace the whole front window, (there was nothing on Jira) but in the meantime the triangle top window section on the front has moved and gaps have appeared that the wind and water is now coming through - please see photo’s attached.

           I have spoken to Samantha at swift who said that they want to go down next week w/c 11-03-12 but this still needs to be confirmed - she asked if anyone could go and try to make the area water tight - Steve is on site doing PDI'S today so I have asked him to go and see if there is anything that he can do.
          Due Date 06/Aug/12 01/Apr/13
          Linda Trunkfield (Inactive) made changes -
          Attachment IMG_1065.JPG [ 39342 ]
          Attachment IMG_1067.JPG [ 39344 ]
          Attachment IMG_1066.JPG [ 39343 ]
          Linda Trunkfield (Inactive) made changes -
          Attachment IMG_1068.JPG [ 39345 ]
          Linda Trunkfield (Inactive) made changes -
          Status Open [ 1 ] Submitted [ 10001 ]
          Linda Trunkfield (Inactive) made changes -
          Attachment IMG_1069.JPG [ 39348 ]
          Linda Trunkfield (Inactive) made changes -
          Attachment screenshot-1.jpg [ 39349 ]
          Linda Trunkfield (Inactive) made changes -
          Attachment screenshot-2.jpg [ 39353 ]
          Lorraine Pryor (Inactive) made changes -
          Attachment screenshot-3.jpg [ 39555 ]
          Linda Trunkfield (Inactive) made changes -
          Status Submitted [ 10001 ] Acknowledged [ 10005 ]
          Linda Trunkfield (Inactive) made changes -
          Status Acknowledged [ 10005 ] Parts ordered [ 3 ]
          Linda Trunkfield (Inactive) made changes -
          Status Parts ordered [ 3 ] Parts Recieved [ 10003 ]
          Linda Trunkfield (Inactive) made changes -
          Status Parts Recieved [ 10003 ] Worksheet Issued [ 10004 ]
          Linda Trunkfield (Inactive) made changes -
          Work Scheduled 11/Mar/13
          Status Worksheet Issued [ 10004 ] Engineer Scheduled [ 10000 ]
          Lorraine Pryor (Inactive) made changes -
          Attachment screenshot-4.jpg [ 39671 ]
          Adrienne Barwell (Inactive) made changes -
          Resolution Completed [ 1 ]
          Status Engineer Scheduled [ 10000 ] Resolved [ 5 ]
          Adrienne Barwell (Inactive) made changes -
          Status Resolved [ 5 ] Complete [ 6 ]
          Lorraine Pryor (Inactive) made changes -
          Resolution Completed [ 1 ]
          Status Complete [ 6 ] Reopened [ 4 ]
          Lorraine Pryor (Inactive) made changes -
          Attachment screenshot-5.jpg [ 40401 ]
          Lorraine Pryor (Inactive) made changes -
          Status Reopened [ 4 ] Complete [ 6 ]
          Resolution Completed [ 1 ]
          Lorraine Pryor (Inactive) made changes -
          Link This issue Same Van SWIFT-5915 [ SWIFT-5915 ]
          Mark Lock (Inactive) made changes -
          Workflow Surfbay [ 78128 ] Manufacturers ver 2.0 [ 92101 ]
          Adrienne Barwell (Inactive) made changes -
          Link This issue Same Van SWIFT-6151 [ SWIFT-6151 ]
          Adrienne Barwell (Inactive) made changes -
          Workflow Manufacturers ver 2.0 [ 92101 ] Manufacturers ver 2.1 [ 127135 ]
          Adrienne Barwell (Inactive) made changes -
          Workflow Manufacturers ver 2.1 [ 127135 ] Manufacturers ver 2.2 [ 143128 ]

            People

            • Watchers:
              0 Start watching this issue

              Dates

              • Due:
                Created:
                Updated:
                Resolved:
                Work Scheduled: