The site have advised that swift are replacing the front windows, however, the triangle top window section on the front has moved and gaps have appeared, that the wind and water is now coming through

    Details

    • Type: Ext Doors & Windows (4 weeks) Ext Doors & Windows (4 weeks)
    • Status: Complete
    • Priority: Critical Critical
    • Resolution: Completed
    • Labels:
      None
    • Customer Code:
      lad01
    • Park:
      Ladram Bay
    • Postcode:
      EX9 7BX
    • Responsibility:
      Manufacturer Attending
    • Plot:
      PV26
    • Serial:
      10930h
    • Model:
      Champagne
    • Size:
      41 x 12
    • Status Colour:
      Complete Complete
    • Park_Company:
       Not defined
    • SLA Status:

      Description

      We have received an e-mail from Gary Rix advising that Swift are going to replace the whole front window, (there was nothing on Jira) but in the meantime the triangle top window section on the front has moved and gaps have appeared that the wind and water is now coming through - please see photo’s attached.

       I have spoken to Samantha at swift who said that they want to go down next week w/c 11-03-12 but this still needs to be confirmed - she asked if anyone could go and try to make the area water tight - Steve is on site doing PDI'S today so I have asked him to go and see if there is anything that he can do.
      1. IMG_1065.JPG
        2.36 MB
      2. IMG_1066.JPG
        2.15 MB
      3. IMG_1067.JPG
        2.71 MB
      4. IMG_1068.JPG
        2.74 MB
      5. IMG_1069.JPG
        3.01 MB
      6. screenshot-1.jpg
        148 kB
      7. screenshot-2.jpg
        160 kB
      8. screenshot-3.jpg
        143 kB
      9. screenshot-4.jpg
        163 kB
      10. screenshot-5.jpg
        170 kB

        Issue Links

          Activity

          Transition Time In Source Status Execution Times Last Executer Last Execution Date
          Open Open Submitted Submitted
          17m 8s 1 Linda Trunkfield (Inactive) 04/Mar/13 1:06 PM
          Submitted Submitted Acknowledged Acknowledged
          3d 1h 46m 1 Linda Trunkfield (Inactive) 07/Mar/13 2:53 PM
          Acknowledged Acknowledged Parts ordered Parts ordered
          12s 1 Linda Trunkfield (Inactive) 07/Mar/13 2:54 PM
          Parts ordered Parts ordered Parts Recieved Parts Recieved
          10s 1 Linda Trunkfield (Inactive) 07/Mar/13 2:54 PM
          Parts Recieved Parts Recieved Worksheet Issued Worksheet Issued
          3s 1 Linda Trunkfield (Inactive) 07/Mar/13 2:54 PM
          Worksheet Issued Worksheet Issued Engineer Scheduled Engineer Scheduled
          7s 1 Linda Trunkfield (Inactive) 07/Mar/13 2:54 PM
          Engineer Scheduled Engineer Scheduled Resolved Resolved
          13d 1 Adrienne Barwell (Inactive) 20/Mar/13 2:54 PM
          Resolved Resolved Complete Complete
          4s 1 Adrienne Barwell (Inactive) 20/Mar/13 2:54 PM
          Complete Complete Reopened Reopened
          5d 1h 4m 1 Lorraine Pryor (Inactive) 25/Mar/13 3:58 PM
          Reopened Reopened Complete Complete
          21s 1 Lorraine Pryor (Inactive) 25/Mar/13 3:59 PM

            People

            • Watchers:
              0 Start watching this issue

              Dates

              • Due:
                Created:
                Updated:
                Resolved:
                Work Scheduled: